Interrogation Site Metadata
CFJ - Clark Flat Acc. Pond
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 3/15/1999 4:33 PM
This site monitors volitional releases from Clark Flat acclimation pond, which is part of the Cle Elum Supplementation and Research Facility. It operates seasonally from when fish are delivered to the pond until after all fish have been forced out at the end of the volitional release period.
Current Operations
Last File Loaded: | CFJ-2024-109-P-020.json |
Date Last File Loaded: | 4/18/2024 9:01 PM |
Date Last File Opened: | 4/18/2024 7:00 PM |
Date Last File Closed: | 4/18/2024 7:59 PM |
Last Observation Tag: | 3DD.003D9026EC |
Last Observation Date: | 4/18/2024 4:51 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 5/17/2023 12:00 AM | |
2022 | 1/25/2022 12:00 PM | 5/27/2022 3:00 PM | According to site Manger Charlie Strom the facility was cleaned up and water was turned off. The creek was cleared of all remaining fish. However because of very high river flows there detections on the monitors after this date. When the river is high enough there is a possibility for fish to swim back into the monitors. |
2021 | 2/9/2021 7:00 AM | 5/14/2021 12:00 PM | |
2020 | 1/22/2020 12:00 AM | 5/18/2020 12:00 AM | |
2019 | 3/14/2019 10:00 AM | 5/14/2019 2:00 PM | Start date and end dates represent the start and end of volitional release. |
2018 | 1/29/2018 8:00 AM | 5/18/2018 12:00 PM | Volitional release began March 15. |
2017 | 1/24/2017 12:00 AM | 5/22/2017 12:00 AM | Fish were delivered to the pond Jan 24 and pushed out of the raceways May 15. |
2016 | 1/25/2016 12:00 AM | 5/13/2016 12:00 AM | |
2015 | 1/12/2015 12:00 AM | 5/15/2015 12:00 AM | Fish were delivered to the site on 1-12-15. |
2014 | 1/6/2014 12:00 AM | 5/20/2014 12:00 AM | Fish were delivered to pond on January 6. Raceways were cleaned and water was turned off on May 20. |
2013 | 2/4/2013 12:00 AM | 5/17/2013 7:59 AM | Fish were delivered to pond by January 10. Raceways and creek were cleared of fish May 15-17. |
2012 | 1/14/2012 12:00 AM | 5/16/2012 12:00 AM | Fish were delivered to the pond sometime in January. Volitional release began on March 15. Remaining fish were forced out of the pond and channel on May 16. |
2011 | 1/20/2011 12:00 AM | 5/17/2011 12:00 AM | Fish were reportedly delivered to the Clark Flat acclimation ponds on January 20. Volitional release began on March 15. Remaining fish were pushed out May 17. |
2010 | 1/14/2010 12:00 AM | 5/25/2010 12:00 AM | Fish were delivered to the acclimation ponds on Jan. 14-15, 2010. The screens were pulled on March 15 to allow volitional egress. The facility was shut down on May 25. |
2009 | 1/21/2009 12:00 AM | 5/18/2009 12:00 AM | Fish were ponded on Jan. 21-22. The volitional release began on March 16. All remaining fish were forced from the ponds on May 15. |
2008 | 1/9/2008 12:00 AM | 5/22/2008 4:30 PM | Fish were ponded at Clark Flat on January 8-9, 2008. The volitional release began at noon on March 14. Any remaining fish were forced out of the raceways on May 14, into the channels above the PIT tag detectors. All fish remaining in the release channel were pushed through the PIT tag detectors on May 22, 2008. |
2007 | 2/1/2007 12:00 AM | 6/15/2007 12:00 AM | Fish were ponded into the Clark Flat Acc. Facility by Feb. 1, 2007. Volitional release began on March 15, 2007. All remaining fish were forced from the ponds on May 15, 2007. The facility was dewatered on June 15, 2007. |
2006 | 1/20/2006 12:00 AM | 5/23/2006 12:00 AM | Fish were transferred into the Clark Flat Acclimation Ponds between Jan. 20 and Jan. 23, 2006. Fish were allowed to volitionally exit the ponds beginning on March 15. All fish were flushed out on May 15, 2006 and screens were pulled to allow for volitional release. Clark Flat was dewatered on May 23, 2006. |
2005 | 1/26/2005 12:00 AM | 5/21/2005 8:00 PM | Fish were introduced into the Clark Flat acc ponds on or before January 26, 2005. Volitional release began on March 9. All remaining fish were pushed out on April 28; 57 PIT tags were detected in the discharge channel between April 29 and May 8, and two tags were detected on May 21. |
2004 | 1/15/2004 9:00 AM | 5/21/2004 12:00 AM | Fish were introduced into the Clark Flat Acc. Ponds beginning on 1/15/04. Volitional release began on March 15. All remaining fish were pushed from the ponds on May 14, but water was left running until May 21 to prevent stranding between the ponds and the river. |
2003 | 1/13/2003 6:00 AM | 5/16/2003 6:00 PM | Fish were delivered to the ponds on Jan 13-14. The scheduled release is documented as beginning on March 14. Remaining fish were crowded from ponds on May 15. Last tags were detected in the exit channel on May 16. |
2002 | 1/15/2002 9:00 AM | 5/31/2002 2:30 PM | Fish delivered 1/15; screens pulled 3/15; no idea when the ponds were emptied. |
2001 | 1/22/2001 8:00 AM | 6/1/2001 8:00 AM | Screens pulled on 3/15/01; site dewatered by 6/1/01. |
2000 | 1/28/2000 5:55 PM | 6/12/2000 11:00 AM | First year of operation. Contact YIN for the actual dates of release. |
1999 | 3/15/1999 4:33 PM | 5/24/1999 1:34 PM | Dates and times based on first/last reported detections. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
EAST RIVER EXIT | A1 | A1 |
EAST RIVER EXIT | A2 | A2 |
WEST RIVER EXIT | B1 | B1 |
WEST RIVER EXIT | B2 | B2 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
This displays the last 25 events, to see the full history, log in to theĀ Event Logs.
Event Date | Event Type | Comments |
---|---|---|
3/6/2024 9:46:37 AM | ErrorsCleared | Noted. |
2/29/2024 2:55:00 PM | SiteUp |
The site will be pulling boards on 3-15. According to Charlie they may pull boards earlier if there is a "freshlet" in the river. We are making the site up for that reason. |
12/15/2023 8:57:00 AM | General |
All transceiver buffers were cleared the week of 12/11/2023. |
11/13/2023 8:12:00 AM | General |
The annual Windows 10 LTSC updates were completed last Tuesday, Nov. 7 along with the upgrade of M5 to 2.1.8 . All site DCP's , SByC and non , now run the same version of M5. No outstanding issues to report. |
10/4/2023 8:24:00 AM | GMC |
Installed automatic transfer switches on UPS's. |
9/15/2023 7:26:30 AM | SiteDown | |
4/20/2023 12:30:00 PM | GMC |
A site GMC was performed. All transceivers were checked for tuning and noise. No problems were discovered during this check. |
1/17/2023 7:45:35 AM | ErrorsCleared | Restarted services on secondary PC. |
1/13/2023 8:00:00 AM | SiteUp |
Fish have been delivered. 6 raceways as per site peronnel. |
11/1/2022 9:25:00 AM | General |
All data collection PC's have been updated with the latest service packs for Windows10 LTSC. M5 software was upgraded to 2.0.2.0 |
9/13/2022 10:56:00 AM | General |
Shut down M5 on Pri and Sec for cell data usage eval. until Oct 13th |
5/27/2022 3:00:00 PM | SiteDown |
According to site Manger Charlie Strom the facility was cleaned up and water was turned off. The creek was cleared of all remaining fish. However because of very high river flows there detections on the monitors after this date. When the river is high enough there is a possibility for fish to swim back into the monitors. |
3/30/2022 11:00:00 AM | General |
Patch file CFJ-2022-089-X-012.json was submitted with id 30819691 to fill data gap on 3/30/2022. |
3/30/2022 10:32:00 AM | GMC |
Checked and tuned transceivers. Replaced UPS1 and UPS2 with Lieberts.
|
3/2/2022 3:00:00 PM | General |
M5 was upgraded to v1.8.8 3-2-2022. |
3/2/2022 2:00:00 PM | General |
Examination of secondary data shows that no detections occurred during the 7 minute gap on 3-2-2022. |
3/2/2022 12:00:00 PM | General |
Upgraded M5 to version 1.8.8 on primary and secondary PCs. |
1/25/2022 12:00:00 PM | SiteUp |
The season started 1-25-2022 at 1200. |
12/13/2021 7:27:56 AM | ErrorsCleared | Probable UPS failure. To be replaced next site visit. |
12/12/2021 9:33:12 AM | ErrorsCleared | Noted. |
12/11/2021 9:19:41 AM | ErrorsCleared | Noted. UPS died. |
12/10/2021 8:03:08 AM | ErrorsCleared | Noted |
12/9/2021 7:34:57 AM | ErrorsCleared | To be investigated. |
9/22/2021 8:47:23 AM | ErrorsCleared | Noted. |
9/16/2021 7:56:31 AM | ErrorsCleared | To be investigated. |