EVENT LOG FOR SITE CFJ The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 12/01/2008 07:27 Darren I was able to PCA into the site and push 27 files manually. I checked the TEMP file and found a compressed zip file that could not be deleted until the program was closed. We will chekc to see that the automated upload process resumes operation. 11/04/2008 07:31 Darren Manually pushed the outstanding files to PTAGIS. 10/28/2008 07:16 Darren I was able to PCA into the site and manually push the files to the database. 10/27/2008 07:22 Alan Manually pushed CFJ08300.F1 - CFJ08301.B1 to PTAGIS via PCA. 10/13/2008 07:33 Scott_Li Removed the noping statement from Hobbit. Hobbit will now monitor the health for this site. 10/13/2008 07:30 Scott_Li Enabled the file submission checking process for these sites as they were returned to operation on Nov. 9th 08. 10/01/2008 16:28 Scott_Li Removed these sites from the file submission reporting tool until further notice. 09/25/2008 13:31 scottl The site computers have been removed therefore any file submission to PTAGIS has been suspended.The new replacement PC's will be re-installed in the weeks to come. Also, the UPS back panels have also been removed and will be fitted with new replacement units and returned to operation in the next few weeks. 06/18/2008 08:28 Darren I PCA'd into the site because it had not sent files since Tuesday. I tried to manually send them but the connection failed after connecting to the server. I closed the application and restarted. I was then able to send all 9 files. The site has been without fish since late May. 05/23/2008 16:46 Dave I updated etc/sites to point site-checking alerts to ptoc_ken only. 05/23/2008 10:13 Darren PSMFC confirmed, through the Charlie Strom, that the facility was officially shut down for the season at 16:30 on Thursday 5-22-08. All remaining fish in the release creek were pushed through the monitors at that time. 05/21/2008 08:34 Darren I was able to PCA into the site and retrieve the missing CFJ08140.G1 file from yesterdays ISP mishap. 05/15/2008 12:01 Darren PSMFC was informed by Charlie Strom from the Cle Elum Hatchery that the remaining fish in the raceways at each site were forced out yesterday (5- 14-08) with most of the fish leaving the facility through the detectors. However some fish still remain in the creek above the detectors. The sites are being prepared for the end of the season and Charlie will inform PSMFC as to the date and time of when each facility will be considered done for the season. 05/12/2008 11:26 Alan Manually pushed CFJ08133.C1 to PTAGIS via PCA. 05/07/2008 13:39 scottl Performed site GMC, asigned asset numbers to electrical enclosures and anthro carts, No problems to report. One note, the Acc. ponds only have one more week of operation until fish are crowded out and the facilities are shutdown for the year. 04/29/2008 14:43 Darren A site GMC was performed today (4-29-08). All transceivers were checked for tuning and noise. 10 test sticks were passed through both the "A" and "B" monitors with 100% detection. No problems were discovered during this visit. 04/21/2008 13:50 Alan A GMC was performed 4/21/2008. All transceivers were tuned. The stick test was aborted when it was realized that the sticks were not exiting the "East River Exit" (A1 & A2) monitor. Site personnel report that a tree has fallen into the outfall upstream of the monitor entrances and it is suspected that branches from that tree are in the monitor. Site personnel are currently working to remedy the situation. Timer tags and actual fish traffic show excellent PIT Tag detection. The clocks on both PCs were set to within one second of atomic time, no other problems found. 04/09/2008 08:57 Scott_Li Per DJ at the Cle Elum Hatchery, The screens were pulled on March 25th, 08 @ 0700 hrs. 04/07/2008 13:52 Alan Manually pushed CFJ08098.D1 to PTAGIS via PCA. 04/02/2008 15:15 Alan A GMC was performed 4/2/2008. All transceivers were tuned. 15 test sticks were passed through each monitor, results following: A1 15/15 A2 15/15 B1 14/15 B2 15/15 The transceiver CPU batteries had been replaced during an earlier visit. The clocks on both PCs were set to within one second of atomic time. No problems found. 03/17/2008 14:38 Darren Charlie Strom from the YIN called me this morning and confirmed that the boards were pulled from ESJ on Friday at 10:00 and at CFJ at 12:00. 03/12/2008 08:32 Dave According to Charlie Strom, fish were ponded at Clark Flat on January 8 and 9. 03/10/2008 07:40 Alan Manually pushed CFJ08067.C1 to PTAGIS via PCA. 03/08/2008 09:10 Troy Checked into why the site didn't load. Was able to PCA but when I tried to push the file it failed. A test load failed as well. I opened a browser and checked the router. Both tunnels were connected. I tried another test load and it was succesfull. I then pushed the delinquent file. Will monitor for future loads. 03/07/2008 07:53 Darren PSMFC was on site yesterday 3-6-08 to replace the UPS's on the data collection platform. No problems occured during the installation. 03/05/2008 07:52 Troy Big brother showed CFJ-PC1, PC2 and router to be red. I was able to PCA into the PC2 and all looks ok. Logged into the router and found Tunnel 1 to show disconnected? Clicked connect. PSFMC will monitor to see if Big brother indication comes back. 02/28/2008 11:04 Alan A power outage caused a 02:19:00 data gap on 2/26/2008. No data exist on either PC to fill this gap. 02/28/2008 08:01 Darren There is a file gap of about 5 hrs on 2/27/08. There was a site wide power outage followed by subsequent smaller outages. This was confirmed by site personnel. 02/27/2008 08:17 Alan PTAGIS Field Operations will be onsite today to investigate connectivity and file loading issues. 02/23/2008 09:23 troy@ruf A1:TestTagFailure,A2:TestTagFailure: Noted. Clearing TASS 02/22/2008 16:42 Darren The site has been switched over to a satellite internet connection via Starband. The dish and modem were installed along with a VPN router over the last two days. The Files that have been collected since 1-14-08 were sent into PTAGIS for processing. The Antennas were tuned and a failed timer tag on A2 was replaced. Test sticks were passed through the monitor with 10 of 10 being detected on all four antennas. 02/06/2008 07:10 darren@r A2:TestTagFailure: clearing TASS. 01/01/2008 00:00 PTOC_Bot Annual log file initiation for CFJ #### End of Event Log for CFJ ###