Interrogation Site Metadata

LOP - Lostine River Acc. Pond

Status:   Decommissioned
Site Type: Monitored Fish Release  |  Organization: Nez Perce Tribe
General Operational Period: Seasonally
Start Date: 2/26/2002 12:00 PM
End Date: 4/24/2014 12:00 AM

Lostine River Acclimation Pond

Contacts

Data Steward:

Shane Vatland
shanev@nezperce.org
541-432-2508

Location

Coordinates: 45.420648, -117.425588  |  River Km: 522.271.131.042.021

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2014 3/6/2014 12:00 AM 4/24/2014 12:00 AM
2013 3/8/2013 12:00 AM 4/23/2013 12:00 AM First group of fish delivered on March 11; volitional release from March 21 - April 1. Second group arrived on April 2, all fish forced out April 22. Equipment powered down April 23.
2012 3/6/2012 12:00 AM 4/27/2012 12:00 AM Fish delivered March 12; volitional release started March 22; remaining smolts forced out of pond March 26. Second set of fish delievered April 3; volitional release started April 13; ponds dewatered April 22.
2011 3/10/2011 12:00 AM 4/19/2011 6:31 PM Fish were transferred into pond on Mar. 11. Volitional release began Apr. 8. Volitional release ended Apr. 19, when pond levels were lowered and remaining fish were forced out.
2010 3/1/2010 12:00 PM 4/23/2010 1:00 PM There were two volitional releases of spring Chinook from the Lostine acclimation pond in 2010, the first from March 17-30 and the second from April 10-20. See the 2010 LOP event log for operational details.
2009 3/2/2009 12:00 AM 4/23/2009 12:00 AM The first group of juvenile spring Chinook salmon were transferred into the Lostine Acc. Pond on March 2, 2009. The first volitional release began on March 18. There was a power outage sometime between midnight and 1700h on March 29. Buffered detection data were later retrieved from the transceivers. The first group of fish were forced out on March 31. The second group of juvenile spring Chinook salmon were tranferred into the pond on April 1. The second group was forced out on April 21. Interrogation activities concluded on April 23.
2008 3/3/2008 6:00 AM 4/18/2008 6:00 AM Two groups of fish were released at the Lostine River Acclimation Pond in 2008. The first group was ponded on March 3, and released between March 19 and April 1. The second group was ponded on April 3 and released between April 10-17. Peter Cleary, NPT (peterc@nezperce.org), is the point of contact for the LOP detection data.
2007 3/2/2007 12:00 AM 4/17/2007 12:00 AM The first group of fish were introduced into the Lostine Pond beginning on March 5, 2007. The first volitional release occurred between March 16 - 26. The second group of fish were ponded beginning March 27. The second volitional release occurred between April 7 - 17.
2006 3/8/2006 12:00 AM 4/10/2006 12:00 AM The first volitional release monitored by LOP occurred from March 8 through March 20, 2006. The second volitional release occurred from March 28 through April 10, 2006.
2005 3/11/2005 12:00 AM 4/1/2005 12:00 AM Chinook were trucked to the Lostine Pond from Lookingglass Hatchery on February 28, 2005. The first volitional release began on March 11, and the last of the fish were forced out on March 20. The second shipment of Chinook arrived from LOOH on March 21. The second volitional release began on March 28, and the remaining fish were forced out on April 1. On March 29, the detection computer was down from about 9:40AM until 4:50PM.
2004 3/1/2004 6:00 AM 4/15/2004 12:00 AM The following is per Peter Cleary, Nez Perce Tribe: 2/27/04 - Biomark Personnel started and tested the interrogation system. 3/1 - Fish delivered to ponds. 3/15 - First volitional release period begins. 3/21 - First volitional release period ends, fish forced from ponds. 3/22 - Second delivery of fish to pond C. 3/23 - Second delivery of fish to pond D, A, and B. 3/29 - Second volitional release period begins. 4/14 - Second volitional release period ends, fish forced from ponds. 4/15 - LOP interrogation system shut down for 2004.
2003 3/3/2003 12:00 PM 4/14/2003 6:00 PM The following is per Peter Cleary, Nez Perce Tribe: March 3 - fish arrive at the acclimation facility. March 17 - pond screens are removed; the first volitional release begins. March 23 - the first volitional release ends; remaining fish are forced from the ponds. March 24 - fish arrive at the acclimation facility for ponds A, B, and D. March 25 - fish arrive at the acclimation facility for pond C. April 1 - pond screens are removed; the second volitional release begins. April 14 - the second volitional release ends, remaining fish are forced from the ponds.
2002 2/26/2002 12:00 PM 4/14/2002 6:00 PM The following is per Peter Cleary, Nez Perce Tribe: February 26 - fish arrive at the acclimation facility. March 8 - Biomark personnel test interrogation system. April 1 - pond screens are removed; the volitional release begins. April 12 - debris in ponds; pond pumps are back flushed. April 13 - debris in ponds; pond pumps are back flushed. April 14 - volitional release ends, remaining fish are forced from the ponds.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/1/2002
End Date:  4/24/2014

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
3/9/2015 11:53:00 AM General The Lostine River acclimation facility received the first group of BY2013 smolts at approximately 17:30 hours. The tag detection system for monitoring smolts leaving the ponds is non-operational. A number of failures occurred at the conclusion of the 2014 acclimation season and the equipment was deemed to old to fix. Volitional release for the first group of BY2013 smolts is set for March 21, 2015.
4/12/2014 8:11:00 AM General Volitional release for the second acclimated group of Lostine River Chinook began today. Screens were lifted in the morning.
4/10/2014 8:11:00 AM General Coil 12 (detects fish leaving ponds C & D) is not sending or receiving test tags. Trouble shooting indicates the problem is most likely with the transceiver. Fish leaving these ponds will still be recorded on coil 11.
3/21/2014 4:23:00 PM General Received an error message from personnel regarding coils 11 and 12. Coil 11 (error-problem overrun) and had fewer test tags received. Coil 12 (error- exciter power low). Also with fewer test tags received. This could be due to moisture/condensation in the coils, will require further trouble shooting at the end of acclimation. Will proceed with operations as they stand.
3/20/2014 4:23:00 PM General Performed stick test today, all coils are functioning. Coil 11 has a 5-7 minute delay.
3/11/2014 1:00:01 PM General Tested the Lostine River FS1001 transceiver system today using stick test tags. All coils are operational. Will test again before the volitional release begins.
3/6/2014 11:30:00 AM General Installed and tested LOP PIT tag interrogation system. Replaced modem nest, identified bad fiber optic cable, all systems are operational. Coils 01,02 and 12, send and receive commands. Coil 11 can send however it does not transmit a return command. This does not affect data collection.
5/3/2013 4:22:43 PM General All interrogation files created at LOP for 2012 were submitted via email and accepted for uploading to PTAGIS today.
4/24/2013 6:00:00 PM General LOP interrogaton equipment removed and stored for the season
4/23/2013 6:00:00 PM General LOP stopped at 18:00
4/22/2013 6:00:00 PM General remaining fish forced out at 14:19
4/16/2013 6:00:00 PM General stick test performed, 9 of 9 sticks read on coils 01 and 11, 8 of 9 sticks read on coils 02 and 12
4/8/2013 7:00:00 PM General The power supply backups failed during a power outage from 6am on April 6 to 6pm on April 8. Files LOP13097.A1 through LOP13098.D do not exist.
4/2/2013 6:00:00 PM General volitional release began at 14:07
4/2/2013 12:00:00 PM General recieved smolts at the acclimation faciltiy
4/1/2013 12:00:00 PM General Error message #9 displayed by Minimon, remaining fish were forced out at 14:24
3/21/2013 12:00:00 PM General volitional release began at 10:51
3/14/2013 12:00:00 PM General stopped and started LOP to replace the power supply backup, power outages causing problems
3/11/2013 12:00:00 PM General recieved smolts at acclimation facility
3/9/2013 12:00:00 PM General started LOP interrogations, stick test perfomed, 8 of 9 sticks read
3/8/2013 12:00:00 PM General 03/08/2013 - installed and tested LOP PIT tag interrogation system