EVENT LOG FOR SITE LOP The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 04/21/2008 13:00 Dave Peter Cleary, NPT (peterc@nezperce.org), provides the following information regarding the 2008 monitored releases at the Lostine River Acc. Pond: 02/25/08 - Minimon system assembled and operational. 03/03/08 - First group of Lostine River Chinook salmon received. 03/12/08 - Test Tag for Coil 11 fails. Coil 11 turned off. 03/19/08 - First volitional release begins. 04/01/08 - First volitional release ends and the remainder of the fish are forced out of the ponds at 15:30. 04/03/08 - Second group of Lostine River Chinook salmon received. 04/07/08 - Test tag 3D9.0EEEEEE5C9 on Coil 11 is replaced with test tag 3D9.0EEEEEE314. Coil 11 turned on. 04/10/08 - Second volitional release begins. 04/17/08 - Second volitional release ends and the remainder of the fish are forced out of the ponds at 14:45. 04/18/08 - Minimon system is disassembled. 01/01/2008 00:00 PTOC_Bot Annual log file initiation for LOP #### End of Event Log for LOP ###