EVENT LOG FOR SITE LOP Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What ---------- ----- -------- ----------------------------------------------- 04/11/2005 11:01 Dave I compiled and manually submitted LOP05086.ALL, containing the LOP data from March 27 through April 1, as requested by Peter Cleary. Peter also provided the following update to his previous activity calendar. 3/28 - Second volitional release of Lostine River Chinook salmon begins. 3/29 - The computer running MiniMon apparently overheats at 0940 and the replacement computer is operational at 1649. 4/1 - The second volitional release ends. 03/21/2005 16:36 Dave I compiled and manually submitted LOP05070.ALL, containing the LOP data from March 11-21, as requested by Peter Cleary. Peter also provided the following activity calendar. 2/28 - Fish arrive at LOP from LOOH 3/9 - PSMFC site visit by Don Warf and Scott Livingston, Firmware upgraded in Destron FS1001 units 3/11 - First volitional Release of Lostine River Chinook Salmon begins 3/20 - Chinook salmon forced out of acclimation ponds 3/21 - Second shipment of Chinook salmon arrive from LOOH 03/17/2005 11:42 Scott_Li Note that the data collection laptop computer was set to observe DST, This was corrected during the site visit on 3/9/05. 03/16/2005 08:47 Scott_Li While visiting the site ,Transceivers 01,02,11,12 were flashed with the latest 5.0 fw on 3/9/05. Stick tested each transceiver with a BE,ST and SGL tag types, all 4 transceivers read each of the tags for 100 percent detection efficiency. 03/11/2005 16:12 Dave Peter Cleary reported that NPT began volitionally releasing fish today (3/11/05) from the Lostine River Acclimation Ponds (LOP). 03/11/2005 12:58 Don_Warf Visited site for walk-through with Peter Cleary. Flashed all four transceivers with ver. 5.0. Ran a stick test with BE, ST and SGLs tags to verify flash. All sticks read on all transceivers at 100%. ####End of Event Log for LOP###