MCD - Mill Creek Diversion Project

Status:   Decommissioned
Site Type: Combined Dam Location  |  Organization: Confed. Tribes of the Umatilla Indian Reser.
General Operational Period: Year Round
Start Date: 2/25/2005 12:00 AM
End Date: 12/8/2021 11:08 AM

This interrogation system includes the fish bypass and passage facilities at the (Bennington) Diversion Dam and the first Division Works in the Mill Creek Diversion Project in the Walla Walla Basin. It was split into two separate sites in December 2021. The Mill Creek Bennington Diversion Dam is now site MBD and the Mill Creek Division Works is now MDW.

Contacts

Primary Contact:

Robert Hogg
RobertHogg@ctuir.org
541-429-7547

Data Steward:

Travis Olsen
travisolsen@ctuir.org
541-429-7542
Location
Coordinates: 46.079843, -118.254402  |  River Km: 509.054.019
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  10/7/2021
End Date:  12/8/2021
Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary
Archived Event Logs