EVENT LOG FOR SITE MCD The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 01/11/2011 10:27 Courtney 12/13/10 at 06:00 to 12/16/10 at 17:40 - Site power down. No data collected at this time. 11/15/2010 15:10 Courtney 11/01/10 09:23 to 11/5/10 at 14:05 - Bennington Dam - Power down at site due to ACOE operations. No data were collected during this time. Submitted MCD10319.ALL with missing detections since 10/15/10. 10/26/10 at 05:08 to 10/27/10 at 08:59 - Bennington Dam - Power down at site due to ACOE operations. No data were collected during this time. 10/15/10 at 08:37 to 10/19/10 at 12:29 - Bennington Dam - ACOE is upgrading the power and equipment at the dam. Power will be on and off through mid November. 11/02/2010 12:23 Courtney 10/15/10 at 09:00 to 10/19/10 at 12:30 - Bennington Dam - Construction at the dam cut power at to the site during this time period. No data were collected. 09/14/2010 14:05 Courtney 9/14/10 - MCD - Division Works - Prior to this message the MUX and computer times were following Pacific Daylight Time . Clocks were "reset" to Pacific Standard Time on 9/14/10. 09/09/2010 10:34 Courtney 9/1/10 - Division Works - MUX Firmware 2.1 updated and Minimon 1.5.3 installed. 9/1/10 - Bennington Dam - MUX Firmware 2.1 updated and Minimon 1.5.3 installed. Updated Minimon country code/registry to correctly report PITtags with 384 prefix. 08/27/2010 15:03 Courtney 8/25/10 - MCD - Division Works - Remotely accessed site and updated Minimon country code/registry to correctly report PITtags with 384 prefix. 8/12/10 at 19:59 - MCD - Division Works - A3, A4, A5, A6 were installed on the dam spillway. Approx 60% of the spillway is covered (2 center gates). Center gates are opened at 400 cfs until flows exceed 1000cfs at which point all 4 gates are opened. Flows only top 400cfs~11 days per year. 8/11/10 - MCD - Bennington Dam - Arrived to site computer down. Harddrive shot. Replaced site computer and serial to USB converter. No interrogation files from 7/29/10 00:00 to 8/12/10 at 18:25. Checked buffer file for missing detections. No detections found. 08/24/2010 09:43 Dave I updated the site configuration to #170, which now includes the four antennas (A3-A6) centered in the basin below the Division Works spillway. I also created and registered an MCD_Timer_Tags.txt definition file. 07/08/2010 09:43 Courtney 6/10/10 at 17:11 to 6/15/10 at 07:48 - Bennington Dam - Computer / battery backup issues. Site was down for this time period. NO DATA WERE COLLECTED. 01/20/2010 11:27 Courtney 12/29/09 at 00:01 to 12/31/09 at 23:59 - MCD Division ladder computer off. The buffer was check and there were no detections during this time period. 01/20/2010 11:27 Courtney 1/1/10 at 00:01 to 1/13/10 at 08:00 - MCD Division ladder computer off. The buffer was check and there were no detections during this time period. 01/01/2010 00:00 PTOC_Bot Annual log file initiation for MCD #### End of Event Log for MCD ###