Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

CLJ - Clearwater River Trap

Status:   Decommissioned
Site Type: Instream Juvenile Fish Trap  |  Organization: Idaho Dept. of Fish and Game
General Operational Period: Seasonally
Start Date: 3/30/1989 8:00 AM
End Date: 3/4/2014 12:00 AM

The Clearwater River Smolt Trap is located 10 kilometers above the mouth of the Clearwater River. CLJ was deployed during the Spring migration annually between 1989-1998, and has been deployed each spring since 2002. PIT tag interrogation data are generated for previously-tagged fish recaptured at the trap.

Contacts

Data Steward:

Scott Putnam
scott.putnam@idfg.idaho.gov
208-750-4243
Location
Coordinates: 46.425001, -116.922855  |  River Km: 522.224.010
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/1/1994
End Date:  3/4/2014
Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary