Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

ICL - Lower Icicle Instream Array

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 9/8/2011 1:07 PM

ICL is a permanent instream PIT tag interrogation site at RKM 0.4 on Icicle Creek. The site consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of six (three 20-foot and three 15-foot) PVC antennas, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs were connected to a QST QuBE ACN controller until August 2019 when the QuBE was replaced with a Biomark IS1001 master controller. The antennas were built and installed by WDFW. The site is connected to grid power to charge the battery bank powering the detection system. A cellular modem is installed on site to provide remote communication and allow for automated data collection. A submersible pressure transducer and temperature probes were installed on site until August 2019 when they were removed.

Current Operations

Last File Loaded: ICL-2024-325-P-001.json
Date Last File Loaded: 11/25/2024 10:20 AM
Date Last File Opened: 11/20/2024 11:52 AM
Date Last File Closed: 11/25/2024 9:52 AM
Last Observation Tag: 3DD.003DF5D6CA
Last Observation Date: 11/25/2024 9:49 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Matthew Stilwater
matthew.stilwater@dfw.wa.gov
509-664-3148
Location
Coordinates: 47.578648, -120.662589  |  River Km: 754.041.000
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  10/15/2014
End Date:  ----
Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary
Archived Event Logs