Interrogation Site Metadata
CLP - Coulter Creek Acclimation Pond
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 4/4/2006 12:00 AM
Coulter Creek Acclimation Pond, Wenatchee River Basin
Current Operations
Last File Loaded: | CLP-2023-103-P-001.json |
Date Last File Loaded: | 7/24/2023 2:31 PM |
Date Last File Opened: | 4/13/2023 10:07 AM |
Date Last File Closed: | 5/24/2023 8:25 AM |
Last Observation Tag: | 3DD.003DF70D0B |
Last Observation Date: | 5/24/2023 8:25 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 4/13/2023 12:00 AM | 4/14/2023 12:00 AM | Start and end dates based on timer tags. |
2022 | No 2022 data received for this site. | ||
2021 | No data received for 2021 | ||
2020 | 3/20/2020 5:00 AM | 6/30/2020 11:00 AM | Start and end dates based on file open and close dates. |
2019 | No tagged fish were released from this location in 2019 so the interrogation site did not operate. | ||
2018 | 4/26/2018 12:00 AM | 7/2/2018 12:00 AM | Start and end dates based on file open and close dates. |
2017 | No data received. | ||
2016 | 2/25/2016 12:00 AM | 6/10/2016 12:00 AM | Start and end dates based on file open and close dates. |
2015 | Site did not operate. | ||
2014 | 4/4/2014 12:00 AM | 6/23/2014 12:00 AM | |
2013 | 3/29/2013 12:00 AM | 6/13/2013 12:00 AM | Start and end dates based on file open and close dates. |
2012 | 4/12/2012 12:00 AM | 6/15/2012 12:00 AM | Antenna A0 was installed April 12, B0 was installed May 2. Juvenile coho delivered to pond on April 13. Volitional release ran from May 14 - June 15. Both antennas were removed June 15. |
2011 | This site was not operational during 2011. | ||
2010 | No monitored release activity at Coulter Creek Pond in 2010. | ||
2009 | There were no monitored releases from Coulter Creek Pond in 2009. | ||
2008 | There were no monitored releases from Coulter Creek Pond during 2008. | ||
2007 | 4/1/2007 12:00 AM | 6/25/2007 12:00 AM | Detection systems were in place at Coulter pond on 4/1/07. Release and first detection did not occur until 4/27/07. Detection activity concluded on 6/25/07. Contact Christa Strickwerda (christa@mid-columbia-coho.net) for more information. |
2006 | 4/4/2006 12:00 AM | 6/19/2006 12:00 AM | Contact Christa Strickwerda (christa@mid-columbia-coho.net) for information regarding the 2006 monitored release from Coulter Creek Pond. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
POND EXIT | 01 | 01 |
POND EXIT | 02 | 02 |
POND EXIT | 03 | 03 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
4/13/2023 12:00:00 AM | SiteUp | Coho release 2023 |
4/13/2023 12:00:00 AM | SiteUp | coho release 2023 |
4/13/2023 12:00:00 AM | SiteUp | coho release 2023 |
7/14/2015 11:17:00 AM | General | CLP interrogation units were not used in 2015. |
6/26/2015 8:00:00 PM | General | CLP was not monitored in 2015. |