Interrogation Site Metadata
ZEN - Secesh River at Zena Cr. Ranch
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 3/12/2009 12:00 PM
This is an in-stream interrogation system consisting of two separate antenna arrays, 130 meters apart, near the Zena Creek Ranch. The upstream and downstream arrays consist of four flat plate antennas each, spanning 24 meters (80 ft.) across the low-water channel.
Current Operations
Last File Loaded: | ZEN-2024-110-P-006.json |
Date Last File Loaded: | 4/20/2024 3:50 AM |
Date Last File Opened: | 4/19/2024 7:36 PM |
Date Last File Closed: | 4/19/2024 10:36 PM |
Last Observation Tag: | 3DD.003D494D2A |
Last Observation Date: | 4/19/2024 1:58 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on timer tags. |
2015 | 1/1/2015 12:00 AM | 1/1/2016 12:00 AM | |
2014 | 1/1/2014 12:00 AM | 1/1/2015 12:00 AM | |
2013 | 1/1/2013 12:00 AM | 1/1/2014 12:00 AM | B0 mux down from May 8-14. |
2012 | 1/1/2012 12:00 AM | 1/1/2013 12:00 AM | |
2011 | 1/1/2011 12:00 AM | 1/1/2012 12:00 AM | |
2010 | 1/1/2010 12:00 AM | 1/1/2011 12:00 AM | |
2009 | 3/12/2009 12:00 PM | 1/1/2010 12:00 AM | First year of operation. The ZEN (A0 - upstream and B0 - downstream) arrays were installed the week of March 9, 2009. Each array consists of four 20-ft. Biomark pass-by antennas. Monitoring at both arrays began at approximately noon on March 12, 2009. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
UPPER IN-STREAM ARRAY | A0 | A1 |
UPPER IN-STREAM ARRAY | A0 | A2 |
UPPER IN-STREAM ARRAY | A0 | A3 |
UPPER IN-STREAM ARRAY | A0 | A4 |
LOWER IN-STREAM ARRAY | B0 | B1 |
LOWER IN-STREAM ARRAY | B0 | B2 |
LOWER IN-STREAM ARRAY | B0 | B3 |
LOWER IN-STREAM ARRAY | B0 | B4 |
LOWER IN-STREAM ARRAY | B0 | B5 |
LOWER IN-STREAM ARRAY | B0 | B6 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
2/9/2024 12:00:00 AM | SiteUp |
ZEN A0 and ZEN B0 propane tanks were filled. Started TEG at both sites February 9, 2024. ZEN sites are operating continuously without disruption through February 12, 2024. |
2/1/2024 12:00:00 AM | SiteDown |
ZEN A0 stopped operating from running out of propane on February 1. ZEN B0 also ran out of propane on February 8. |
8/23/2023 12:00:00 AM | General |
ZEN B0 antenna B2 was replaced with a Biomark 20 ft. HDPE antenna due to a loss in current in the original stout antenna. ZEN A0 and ZEN B0 are operating continuously without disruption through November 2, 2023. |
9/8/2022 12:00:00 AM | SiteUp |
ZEN A0 and ZEN B0 are operating continuously without disruption through September 9, 2022. |
9/28/2021 12:00:00 AM | General |
ZEN B0 antenna B1 was replaced with a Biomark 20 ft. PVC antenna on September 28, 2021 due to a loss in antenna current on November 28, 2020. ZEN A0 and ZEN B0 are operating continuously without disruption through November 2, 2021. |
11/25/2019 10:08:47 AM | General | Sites ZEN A0 and ZEN B0 have been operating continuously without disruption through November 25, 2019. |
11/30/2017 8:26:21 AM | General | ZENA0 array had the non-functional Global Star satellite modem replaced with a Hughs Net modem on March 23, 2017. A set of batteries was replaced on August 1, 2017 and the other set of batteries replaced on August 4, 2017. ZENB0 required no maintenance in 2017. ZENA0 and ZENB0 arrays have run continuously without disruption through November 30, 2017. |
11/16/2016 9:08:00 AM | General | ZEN A0 satellite modem seized to function on 8/14/16. ISEMP personnel have made site visits to download data. ZEN A0 and ZEN B0 have operated without disruption through 11/16/16. |
10/23/2013 9:48:51 AM | General | The site ZEN A0 has been running continuously without disruption through 10/23/13. No new maintenance was performed. The site ZEN B0 MUX transceiver system froze up on 5/8/13 resulting in a data collecting disruption through 5/14/13 when repairs were made. The site has been running continuously through 10/23/13. |