EVENT LOG FOR SITE ZEN The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 11/28/2012 14:59 Cameron Secesh River Array ZEN A0 The transceiver froze up in April 2012 resulting in the interruption of TAG and DRS data. Resetting the transceiver resolved the issue. The TEG regulator was cleaned in October 2012 due to low power output. Secesh River Arrays ZENB0 In April 2012, a 20 ft PVC antenna was added on river left, extending from the left bank to the existing Biomark antennas. 11/28/2012 14:33 A0_Camer The transceiver froze up in April 2012 resulting in the interruption of TAG and DRS data. Resetting the transceiver resolved the issue. The TEG regulator was cleaned in October 2012 due to low power output. An air temperature probe was added to ZENA0 on September 29, 2011. No equipment required maintenance in 2011 and no downtime was experienced. Cleaned thermo electric generator 2012. Cameron M. Albee Nez Perce Tribe Fisheries 500 N. Main St. / PO Box 909 Joseph, OR 97846 541-432-2503 Fisheries Logo transparent 01/01/2012 00:00 PTOC_Bot Annual log file initiation for ZEN #### End of Event Log for ZEN ###