Interrogation Site Metadata
TLT - Tillicum Creek Temporary Array
Status: DecommissionedGeneral Operational Period: Seasonally
Start Date: 3/3/2011 12:00 AM
End Date: 6/4/2014 12:00 AM
This site is a temporary PIT tag detection system located at rkm 0.1 on Tillicum Creek (Entiat River basin). The detection system consists of one 10-foot antenna, installed in pass-through configuration. The antenna spans the wetted width of the channel during base flows. The antenna is operated by an Allflex RM 310 reader board. Data from the antenna is stored on an Acumen DataBridge. A 6 VDC battery bank powers the detection system. The antenna was built and installed by WDFW. The site is typically installed and operated March-June annually.
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2014 | 3/19/2014 12:00 AM | 6/4/2014 12:00 AM | No interruptions in operations. |
2013 | 3/26/2013 12:00 AM | 6/26/2013 12:00 AM | No interruptions in operations. |
2012 | 3/16/2012 12:00 AM | 6/11/2012 12:00 AM | No interruptions in operations |
2011 | 3/3/2011 12:00 AM | 5/24/2011 12:00 AM | No interruptions in operations |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Instream Array | 01 | 01 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
3/19/2014 12:00:00 PM | General | TLT was installed on 3/19/2014. The detection system consisted of one, 10' antenna installed in pass through configuration, spanning the majority of the wetted width during base flows. The antenna was operated by an Allflex RM310 reader board. Data from the antenna was stored on an Acumen DataBridge. A 6 VDC battery bank powered the detection system. The detection system was removed on 6/4/2014. The detection system was fully operational for the duration of the installation period. |
3/26/2013 12:00:00 PM | General | TLT was installed on 3/26/2013. The detection system consisted of one, 10' antenna installed in pass through configuration, spanning the majority of the wetted width during base flows. The antenna was operated by an Allflex RM310 reader board. Data from the antenna was stored on an Acumen DataBridge. A 6 VDC battery bank powered the detection system. The detection system was removed on 6/26/2013. The detection system was fully operational for the duration of the installation period. |