EVENT LOG FOR SITE TLT The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 08/16/2013 12:30 Ben TLT was installed on 3/16/2012. The detection system consisted of one, 10' antenna installed in pass through configuration, spanning the majority of the wetted width during base flows. The antenna was operated by an Allflex RM310 reader board. Data from the antenna was stored on an Acumen DataBridge. A 6 VDC battery bank powered the detection system. The detection system was removed on 6/11/2012. The detection system was fully operational for the duration of the installation period. Ben Truscott WDFW #### End of Event Log for TLT ###