Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

SGP - SF Gold Creek Pond Complex

Status:   Decommissioned
Site Type: Monitored Fish Release  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 3/21/2013 3:14 PM
End Date: 6/11/2018 12:00 PM

SF Gold Creek Pond Complex Site was removed after the 2018 release is not scheduled to be used in the near future.

Contacts

Primary Contact:

Rick Alford
alfr@yakamafish-nsn.gov
509-996-9857

Data Steward:

Danielle Grundy
grund@yakamafish-nsn.gov

Location

Coordinates: 48.178095, -120.120838  |  River Km: 843.035.002.003

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2018 4/5/2018 12:00 PM 6/11/2018 12:00 PM
2017 No data received.
2016 3/22/2016 12:00 PM 5/23/2016 12:00 PM
2015 4/1/2015 12:00 AM 6/16/2015 12:00 AM
2014 3/28/2014 12:08 PM 6/16/2014 10:26 AM
2013 3/21/2013 3:14 PM 6/13/2013 9:48 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/7/2013
End Date:  6/11/2018

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
7/23/2018 12:16:40 PM General Interrogation event log for the South Fork Gold Creek Acclimation Site (SGP)-2018 release PIT tag interrogation (Antenna 01) for South Fork Gold Creek Acclimation Pond began on 04-05-2018 at 1200 hrs. Antenna (01) was located 3.0 meters downstream of the lower pond. Antenna (01) was never moved and did not experience any lapse in coverage. A total of 15 files were created, with the last download completed on 06-11-2018 at 1020 hrs following five days of zero hatchery coho unique PIT tag detections. All 15 files were incorporated into one single file. PIT tag interrogation (Antenna 02) for South Fork Gold Creek Acclimation Pond began on 05-01-2018 at 1800 hrs. Antenna (02) was located 20 meters downstream of Antenna (01). Antenna (02) was never moved and did not experience any lapse in coverage. A total of 10 files were created, with the last download completed on 06-11-2018 at 1030 hrs following five days of zero hatchery coho unique PIT tag detections. All 10 files were incorporated into one single file. PIT tag interrogation (Antenna 03), began on 05-01-2018 at 1800 hrs. Antenna (03) was located 15 meters downstream of Antenna (02) near the confluence with South Fork Gold Creek. Antenna (03) was never moved and did not experience any lapse in coverage. A total of 10 files were created, with the last download completed on 06-11-2018 at 1040 hrs following five days of no coho unique PIT tag detections. All 10 files were incorporated into a single file. A snorkel survey was conducted by YN staff on 06-11-2018 to confirm the ponds were devoid of hatchery coho. All interrogation equipment was removed from the acclimation site on 06-13-2018.
5/23/2016 12:00:00 PM General Interrogation event log for the South Fork Gold Creek Pond Acclimation Site (SGP)-2016 release PIT tag interrogation (Antenna 01) for the South Fork Gold Creek Acclimation Pond began on 03-28-2016 at 1222 hrs. Antenna (01) was located above all ponds and approximately 5 meters downstream of the inlet. Antenna (01) was never moved and did not experience any lapse in coverage. A total of 2 files were created, with the last download completed on 05-23-2016 at 1200 hrs, following five weeks of zero coho PIT tag detections. All interrogation equipment was removed on 05-23-2016 after downloading the last file. A snorkel survey could not be completed due to high turbidity/no visibility in all the ponds. PIT tag interrogation (Antenna 02) for the South Fork Gold Creek Acclimation Pond began on 03-28-2016 at 1208 hrs. This system was located 3 meters downstream of the lower pond. Antenna (02) was never moved and did not experience any lapse in coverage. A total of 8 files were created, with the last download completed on 05-23-2016 at 1125 hrs, following twelve days of zero coho PIT tag detections. All interrogation equipment was removed on 05-23-2016 after downloading the last file. PIT tag interrogation (Antenna 03) for the South Fork Gold Creek Acclimation Pond began on 03-22-2016 at 1200 hrs. This system was located 20 meters downstream of antenna (02). Antenna (03) was never moved and did not experience any lapse in coverage. A total of 9 files were created, with the last download completed on 05-23-2016 at 1224 hrs, following twelve days of zero coho PIT tag detections. All interrogation equipment was removed on 05-23-2016 after downloading the last file.
7/1/2015 5:00:59 PM General Interrogation event log for the South Fork Gold Creek Pond Acclimation Site (SGP)-2015 release PIT tag interrogation (Antenna 01) for the South Fork Gold Creek Acclimation Pond, began on 04-01-2015 at 1200 hrs. Antenna 01 was located within the outfall, approximately 3 meters downstream of the most downstream pond. Antenna 01 was never moved and did not experience any lapse in coverage. A total of 6 files were created, with the last download completed on 06-10-2015 at 1200 hrs, following three days of no coho PIT tag detections, and a snorkel survey to confirm the pond void of coho. Antennas (01 and 03) and equipment were removed on 06-16-2015. PIT tag interrogation (Antenna 02) for the South Fork Gold Creek Acclimation Pond began on 03-20-2015 at 1200 hrs. This system was located 10 meters downstream of antenna 01. Antenna 02 did not experience any lapse in coverage, but was removed due to interfering with the other two antennas on 05-02-2015 at 1230 hrs. A total of 1 file was created, with the last download completed on 05-02-2015 at 1200 hrs. PIT tag interrogation (Antenna 03) for the South Fork Gold Creek Acclimation Pond began on 03-20-2015 at 1200 hrs. This system was located 20 meters downstream of antenna 01. Antenna 03 was never moved, and did not experience any lapse in coverage. A total of 5 files were created, with the last download completed on 06-10 -2015 at 1205 hrs, following three days of no coho PIT tag detections, and a snorkel survey to confirm the pond void of coho.
6/18/2014 3:24:18 PM General Interrogation event log for the South Fork Gold Creek Pond Acclimation Site (SGP)-2014 release PIT tag interrogation (Antenna A) for the South Fork Gold Creek Acclimation Pond, began on 03-28-2014 at 1208 hrs.  Antenna A was located within the outfall, approximately 5 meters downstream of the most downstream pond. Antenna A was never moved and did not experience any lapse in coverage. A total of 11 files were created, with the last download completed on 06-16-2014 at 1015 hrs. A snorkel survey was conducted to confirm site void of coho on 06-16-2014 and all interrogation equipment was removed on 06-17-2014. PIT tag interrogation (Antenna B) for the South Fork Gold Creek Acclimation Pond began on 03-28-2014 at 1235 hrs. This system was located 5 meters downstream of antenna A. Antenna B was never moved, and did not experience any lapse in coverage. A total of 10 files were created, with the last download completed on 06-16 -2014 at 1006 hrs. PIT tag interrogation (Antenna C) for the South Fork Gold Creek Acclimation Pond began on 03-28-2014 at 1204 hrs. This system was located 5 meters downstream of antenna B. Antenna C was never moved, and did not experience any lapse in coverage. A total of 11 files were created, with the last download completed on 06-16 -2014 at 1026 hrs. 

Archived Event Logs