Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

RFP - Rolfing Acclimation Pond

Status:   Active - Operational
Site Type: Monitored Fish Release  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 4/30/2004 12:00 AM

Rolfing Acclimation Pond, Wenatchee River Basin.

Current Operations

Last File Loaded: RFP-2023-124-P-002.json
Date Last File Loaded: 7/24/2023 2:31 PM
Date Last File Opened: 5/3/2023 11:59 PM
Date Last File Closed: 5/24/2023 3:50 AM
Last Observation Tag: 3DD.003DFE9E8C
Last Observation Date: 5/24/2023 3:50 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Tim Jeffris
jeft@yakamafish-nsn.gov
509-548-9413 x110

Data Steward:

Jeffrey Caisman
caij@yakamafish-nsn.gov

Location

Coordinates: 47.785040, -120.878984  |  River Km: 754.089.021

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 5/3/2023 12:00 AM 5/5/2023 12:00 AM Start and end dates based on timer tags.
2022 2/22/2022 11:00 PM 7/26/2022 11:00 PM Start and end dates based on file open and closed dates.
2021 3/2/2021 10:00 AM 6/24/2021 11:00 PM Start and end dates based on file open and closed dates.
2020 2/25/2020 5:00 AM 6/15/2020 11:00 AM Start and end dates based on file open and close dates.
2019 4/4/2019 11:00 PM 4/18/2019 11:00 PM Start and end dates based on file open and close dates.
2018 3/22/2018 12:00 AM 7/2/2018 12:00 AM Start and end dates based on file open and close dates.
2017 No data received.
2016 2/25/2016 12:00 AM 5/24/2016 12:00 AM Start and end dates based on file open and close dates.
2015 3/24/2015 12:00 AM 6/30/2015 12:00 AM
2014 No data received.
2013 3/14/2013 12:00 AM 6/12/2013 12:00 AM Fish delivered to pond on March 14; volitional release ran from May 1 - June 12.
2012 3/8/2012 12:00 AM 7/5/2012 12:00 AM Antenna A0 was installed on March 8; Antenna B0 was installed on May 3. Juvenile coho were transported to the pond on March 16. Steelhead were transferred on March 20. Volitional release began on May 15 and concluded on July 5.
2011 3/17/2011 12:30 PM 6/30/2011 12:00 AM See event log for details.
2010 3/23/2010 9:00 AM 6/14/2010 9:40 AM See the RFP 2010 event log for operational details during this monitored release.
2009 3/4/2009 12:00 AM 6/16/2009 12:00 AM Fish were first ponded on March 9, 2009; the volitional release began on May 6. The last detection occurred on June 13; the detection system was removed on June 16, 2009.
2008 3/25/2008 12:00 AM 6/23/2008 12:00 AM The detection system was set up on March 25 and monitoring ceased on June 23. There were no system blackouts. Christa H. Strickwerda. July 21, 2008.
2007 There were no monitored releases from Rolfings Pond in 2007.
2006 There were no monitored releases from Rolfings Pond in 2006.
2005 3/15/2005 12:00 AM 6/28/2005 12:00 AM Contact Keely Murdoch (keely@mid-columbia-coho.net), Cory Kamphaus (cory@mid-columbia-coho.net) or Christa Strickwerda (christa@mid-columbia-coho.net) for information regarding PIT tag detection activities at this acclimation pond.
2004 4/30/2004 12:00 AM 6/5/2004 12:00 AM Contact Keely Murdoch (keely@mid-columbia-coho.net), Cory Kamphaus (cory@mid-columbia-coho.net) or Christa Strickwerda (christa@mid-columbia-coho.net) for information regarding PIT tag detection activities at this acclimation pond.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  4/26/2011
End Date:  ----

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
3/1/2023 12:00:00 AM SiteUp coho release 2023
6/30/2015 8:00:00 PM SiteDown RFP taken down at completion of volitional release.
3/24/2015 7:23:00 AM SiteUp Site up on 3/24/2015.
12/31/2014 11:23:00 AM General RFP interrogation units were not used in 2014.