Interrogation Site Metadata
RFP - Rolfing Acclimation Pond
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 4/30/2004 12:00 AM
Rolfing Acclimation Pond, Wenatchee River Basin.
Current Operations
Last File Loaded: | RFP-2023-124-P-002.json |
Date Last File Loaded: | 7/24/2023 2:31 PM |
Date Last File Opened: | 5/3/2023 11:59 PM |
Date Last File Closed: | 5/24/2023 3:50 AM |
Last Observation Tag: | 3DD.003DFE9E8C |
Last Observation Date: | 5/24/2023 3:50 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 5/3/2023 12:00 AM | 5/5/2023 12:00 AM | Start and end dates based on timer tags. |
2022 | 2/22/2022 11:00 PM | 7/26/2022 11:00 PM | Start and end dates based on file open and closed dates. |
2021 | 3/2/2021 10:00 AM | 6/24/2021 11:00 PM | Start and end dates based on file open and closed dates. |
2020 | 2/25/2020 5:00 AM | 6/15/2020 11:00 AM | Start and end dates based on file open and close dates. |
2019 | 4/4/2019 11:00 PM | 4/18/2019 11:00 PM | Start and end dates based on file open and close dates. |
2018 | 3/22/2018 12:00 AM | 7/2/2018 12:00 AM | Start and end dates based on file open and close dates. |
2017 | No data received. | ||
2016 | 2/25/2016 12:00 AM | 5/24/2016 12:00 AM | Start and end dates based on file open and close dates. |
2015 | 3/24/2015 12:00 AM | 6/30/2015 12:00 AM | |
2014 | No data received. | ||
2013 | 3/14/2013 12:00 AM | 6/12/2013 12:00 AM | Fish delivered to pond on March 14; volitional release ran from May 1 - June 12. |
2012 | 3/8/2012 12:00 AM | 7/5/2012 12:00 AM | Antenna A0 was installed on March 8; Antenna B0 was installed on May 3. Juvenile coho were transported to the pond on March 16. Steelhead were transferred on March 20. Volitional release began on May 15 and concluded on July 5. |
2011 | 3/17/2011 12:30 PM | 6/30/2011 12:00 AM | See event log for details. |
2010 | 3/23/2010 9:00 AM | 6/14/2010 9:40 AM | See the RFP 2010 event log for operational details during this monitored release. |
2009 | 3/4/2009 12:00 AM | 6/16/2009 12:00 AM | Fish were first ponded on March 9, 2009; the volitional release began on May 6. The last detection occurred on June 13; the detection system was removed on June 16, 2009. |
2008 | 3/25/2008 12:00 AM | 6/23/2008 12:00 AM | The detection system was set up on March 25 and monitoring ceased on June 23. There were no system blackouts. Christa H. Strickwerda. July 21, 2008. |
2007 | There were no monitored releases from Rolfings Pond in 2007. | ||
2006 | There were no monitored releases from Rolfings Pond in 2006. | ||
2005 | 3/15/2005 12:00 AM | 6/28/2005 12:00 AM | Contact Keely Murdoch (keely@mid-columbia-coho.net), Cory Kamphaus (cory@mid-columbia-coho.net) or Christa Strickwerda (christa@mid-columbia-coho.net) for information regarding PIT tag detection activities at this acclimation pond. |
2004 | 4/30/2004 12:00 AM | 6/5/2004 12:00 AM | Contact Keely Murdoch (keely@mid-columbia-coho.net), Cory Kamphaus (cory@mid-columbia-coho.net) or Christa Strickwerda (christa@mid-columbia-coho.net) for information regarding PIT tag detection activities at this acclimation pond. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
POND EXIT | 01 | 01 |
POND EXIT | 02 | 02 |
POND EXIT | 03 | 03 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
3/1/2023 12:00:00 AM | SiteUp | coho release 2023 |
6/30/2015 8:00:00 PM | SiteDown | RFP taken down at completion of volitional release. |
3/24/2015 7:23:00 AM | SiteUp | Site up on 3/24/2015. |
12/31/2014 11:23:00 AM | General | RFP interrogation units were not used in 2014. |