Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

PRJ - Prosser Dam (Chandler Dvrsn.)

Status:   Decommissioned
Site Type: Juvenile Fish Bypass Facility  |  Organization: Pacific States Marine Fisheries Commission
General Operational Period:
Start Date: 4/25/1989 10:03 AM
End Date: 7/3/2004 6:00 PM

Chandler Canal Diversion Bypass and Sampling Facility at Prosser Dam

Contacts

Data Steward:

Nicole Tancreto
ntancreto@psmfc.org
503-595-3141
Location
Coordinates: 46.215366, -119.757556  |  River Km: 539.076
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  11/10/1999
End Date:  7/3/2004

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary