EVENT LOG FOR SITE PRJ Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What -------- ----- -------- ----------------------------------------------- 10/11/2004 09:49 Dave I added 'prj' to the Archaic Sites list in etc/sites, effectively invalidating this site code and disabling any further data processing or activity monitoring. 07/09/2004 13:25 Dave Updated ptagis.obs_site_dates table to reflect the end of PRJ sample effort for the 2004 season. Modified etc/sites to alert only the ptoc_ken group in the event of a suspension of automated file uploads. 07/09/2004 12:38 Alan Site personel report that the facility was dewatered and the season concluded on 7/3/2004. 07/06/2004 08:23 alan@ruf A3:TestTagFailure: This alarm was generated by PTAGIS Kennewick personel during a site visit. 06/30/2004 14:41 Alan A GMC was performed 6/30/2004. All transceivers were tuned. The separator was sticktested with 15 sticks, results following: A1 15/15 A2 15/15 A3 15/15 No problems found. 06/14/2004 16:31 Alan This is a test message sent from the ‘legacy’ web interface. It should be deposited in the top-level directory of the Events forum. 06/14/2004 14:36 Alan A GMC was performed 6/14/2004. All transceivers were tuned. The separator was sticktested with 15 sticks, results following: A1 15/15 A2 15/15 A3 15/15 No problems found. 06/07/2004 12:36 Alan A GMC was performed 6/7/2004. All transceivers were tuned. The separator was sticktested with 15 sticks, results following: A1 15/15 A2 15/15 A3 15/15 No problems found. 06/03/2004 13:54 Alan A GMC was performed 6/3/2004. All transceivers were tuned. The separator was sticktested with 15 sticks, results following: A1 15/15 A2 15/15 A3 15/15 No problems found. 05/28/2004 16:01 Alan A GMC was performed 5/28/2004. All transceivers were tuned. The separator was stick tested with 15 sticks, all sticks were seen by all monitors. No problems found. 05/18/2004 11:58 Alan A GMC was performed 5/18/2004. All transceivers were tuned. The separator was stick tested with 15 sticks, all stick were seen by all monitors. 05/13/2004 15:59 Alan A GMC was performed 5/13/2004. All transceivers were tuned. The separator was sticktested with 15 sticks. The report on PC2 shows: A1 17 A2 18 A3 18 No problems found. 05/06/2004 15:58 scott A GMC was performed today, all transceivers were checked and calibrated as necessary. Stick test was not performed due to work going on in the sample holding tank.. Coil efficiencies for all five transceivers are running at better than 98 to 100 percent per the Cum_Eff_Report. 04/30/2004 14:01 Alan A GMC was performed 4/30/2004. All transceivers were tuned. The separator was stick tested with 15 sticks, results following: A1 15/15 A2 15/15 A3 15/15 No problems found. 04/29/2004 15:05 Darren Site was bisited for a GMC. 10 sticks were passed through the separator monitor. The results can be viewed under the stick tag report for PRJ. All transceivers were checked for tuning and noise. No problems were found. 04/26/2004 12:01 Scott_Li Traveled to the site in order to try and correct the problem with the uploader. Talked with John T. about the situation and he recommended a hard reboot of the computer and see what happens on the next upload interval.. The Minimon Log File indicated that the autoupload process never initialized at any of the 3 hr intervals since the dialup PPP connection was changed from OWT to Ellensburg ISP.. Will monitor the situation and take whatever action is required to correct the problem...More soon... 04/25/2004 12:17 Scott_Li PCA'd to PC1 and manually pushed files to PTAGIS. Not sure why the autoup loading has been unsuccessful every since the PPP account was changed to a different service provider, Ellensburg Internet service. Will look into this on Monday morning.. 04/24/2004 10:41 scottl Noticed that the site had not uploaded files since yesterday, PCA'd to PC1 and successfully pushed files to PTAGIS. 3rd times always a charm. 04/14/2004 16:27 Alan I traveled to Prosser to see why the files haven't been loading and found the primary phone line non-operational. I will open a trouble ticket with the appropriate phone company in the morning. In the meantime PC1 has been connected to the secondary phone line and all tardy files manually uploaded. 04/14/2004 15:57 Don_Warf PC1 has been unreachable all day. Data collection has been verified on PC2. We will travel to the site later today. 04/09/2004 14:20 Alan A GMC was performed 4/9/2004. All transceivers were tuned. The separator was stick tested with 20 sticks, all sticks were seen by all monitors. No problems found. 04/05/2004 08:42 Alan Manually uploaded PRJ04095.D1 through PRJ04096.B1. >The following problems with remote sites were detected; > >prj: Last data submission was received on Sun Apr 4 12:04:27 PST 2004 > >Please check this out. 04/04/2004 13:55 Troy Had to PCAnywhere into PC1 and manually sends the files. All the files loaded correctly and the pc is collecting data. 03/18/2004 10:28 Alan Manually submitted PRJ04076.F1 to fill a gap created during a site platform upgrade to Minimon 1.4.4. 03/17/2004 13:18 Alan A GMC was performed 3/16/2004. All transceivers were tuned. The separator was stick tested with 25 sticks, all sticks were seen by all monitors. No problems found. 02/18/2004 15:54 Alan A GMC was performed 2/18/2004. All transceivers were tuned. The separator was stick tested with 25 sticks, results as follows: A1 25 Reads A2 25 Reads A3 24 Reads No problems found. 02/13/2004 08:42 Darren_C The site was visited yesterday to change out the Rocketport cards on the Data Collection Platform. The 18 minute time gap will be filled with the file PRJ04043.N from PC2. Although the site is currently in a production mode there were no PITtag detection's seen during this time gap. 02/02/2004 08:25 Alan Talking with site personel Steve Salinas and Morales during my last visit I found out that the facility was watered up 1-16-2004 as shown in their log book. 01/30/2004 14:26 Alan A GMC was performed 1/30/2004. All transceivers were tuned. PC2 was rebooted as it was returning erratic data from the transceivers. The buffers were cleared on all transceivers. Archived files older than Julian date 04015 (the day before the facility watered up) were moved to C:\Program Files\PTAGIS\MiniMon\2003 Data on both PCs. The Separator was stick tested with 40 sticks and the Sample Room was stick tested with 10 sticks. All sticks were seen by all monitors. No other problems found. 01/06/2004 17:06 Alan As a follow up to the last pitevent, all transceivers have been tuned and are communicating with the collection platform. No other problems found. The site could not be stick tested as there is no water in the system at this time. 01/06/2004 17:01 Alan I replaced Transceiver A1. The malfunctioning unit has lost it's sync output and will be sent to Destron for repair. 01/06/2004 13:43 Dave Darren spoke with Mark Johnstone on 12/29/03 and Mark confirmed that the canal was watering up and that the sampling facility would have water passing through it on Sunday 1/4/04. We have not heard otherwise, and assume the PRJ facility is operating. 01/01/2004 12:02 Dave Initialized new event log for 2004. 2003 event log has been archived. ####End of Event Log for PRJ###