Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

BCP - Butcher Creek Acclimation Pond

Status:   Decommissioned
Site Type: Monitored Fish Release  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 4/21/2004 12:00 AM
End Date: 6/29/2019 12:00 AM

Butcher Creek Acclimation Pond, Wenatchee River Basin.

Contacts

Primary Contact:

Tim Jeffris
jeft@yakamafish-nsn.gov
509-548-9413 x110

Data Steward:

Jeffrey Caisman
caij@yakamafish-nsn.gov

Location

Coordinates: 47.769549, -120.802350  |  River Km: 754.089.013

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2019 3/21/2019 12:00 AM 6/29/2019 12:00 AM Start and end dates based on file open and closed dates.
2018 No data received.
2017 3/20/2017 12:00 AM 7/8/2017 12:00 AM Start and end dates based on file open and closed dates.
2016 No data received.
2015 3/18/2015 12:00 AM 6/27/2015 12:00 AM
2014 Site was not operational during 2014
2013 Site was not operational during 2013
2012 3/26/2012 12:00 AM 6/21/2012 12:00 AM Antenna A0 installed on March 26. Juvenile coho were transferred to the pond on March 27. Antenna B0 installed April 2. Volitional release ran from May 17 - June 21.
2011 3/22/2011 1:30 PM 6/30/2011 12:00 AM One antenna at outflow of pond undtil April 23, when second antenna installed 20m downstream.
2010 3/12/2010 12:00 AM 6/8/2010 12:00 AM Refer to the 2010 BCP event log for operational details.
2009 3/9/2009 12:00 AM 6/17/2009 12:00 AM Fish were first ponded on March 10, 2009; the volitional release began on May 6. The last detection occurred on June 13; the detection system was removed on June 17, 2009.
2008 3/22/2008 12:00 AM 6/19/2008 12:00 AM Monitoring began on March 22 and ceased on June 19. There was one system blackout at each antenna system due to high stream flows in Nasons Creek that required staff to move the detection system transceivers. BCPA1 was offline on 5/16 for 56 minutes between 21:00 and 21:56. BCPA2 was offline on 5/16 for 23 minutes between 21:36 and 21:59. Christa H. Strickwerda. July 21, 2008.
2007 There were no monitored releases at Butcher Creek Pond in 2007.
2006 There were no monitored releases at Butcher Creek Pond in 2006.
2005 4/20/2005 12:00 AM 7/20/2005 12:00 AM Contact Keely Murdoch (keely@mid-columbia-coho.net), Cory Kamphaus (cory@mid-columbia-coho.net) or Christa Strickwerda (christa@mid-columbia-coho.net) for information regarding PIT tag detection activities at this acclimation pond.
2004 4/21/2004 12:00 AM 6/14/2004 12:00 AM Contact Keely Murdoch (keely@mid-columbia-coho.net), Cory Kamphaus (cory@mid-columbia-coho.net) or Christa Strickwerda (christa@mid-columbia-coho.net) for information regarding PIT tag detection activities at this acclimation pond.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  4/28/2015
End Date:  6/29/2019

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
6/27/2015 12:00:00 AM SiteDown Site taken down on 6/27/2015.
3/18/2015 11:23:00 AM SiteUp Site installed on 3/18/2015.
12/31/2014 11:17:00 AM General BCP interrogation units were not used in 2014.

Archived Event Logs