Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

ANT - Antoine Creek Instream Array

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Colville Confederated Tribes
General Operational Period: Year Round
Start Date: 1/1/2011 12:00 AM

Antoine Creek enters the Okanogan River at RKM 98.5, approximately 6 km upstream from the city of Tonasket, WA. Site ANT is located on Antoine Creek, 0.48 km upstream from the confluence with the Okanogan River. The site consists of 3 pass-through HDPE antennas accompanied by individual IS-1001 reader boards in series. Antenna sizes are as follows (upstream to downstream): Ant1 6 feet, Ant2 6 feet, Ant3 10 feet. The site is on grid power. Two banks of 12volt batteries in series create 24volts to run the MTS-MC unit. The batteries are connected to a timer switcher that will switch battery banks every four hours. The battery bank not running the MTS unit is then charged to capacity using a three-stage battery charger. A bioprobe collects and stores both air and water temperatures as well as the water depth data. The ANT site has a Cloudgate 4G cellular modem which transmits data to PTAGIS and Biologic.

Current Operations

Last File Loaded: ANT-2024-356-P-005.json
Date Last File Loaded: 12/21/2024 9:20 PM
Date Last File Opened: 12/21/2024 5:19 PM
Date Last File Closed: 12/21/2024 8:19 PM
Last Observation Tag: 3DD.003D53E944
Last Observation Date: 12/21/2024 6:46 PM
Detection Summary: Last Day's Observations
Contacts

Data Steward:

Randy Johnson
Randy.Johnson.FNW@colvilletribes.com
509-634-1030
Location
Coordinates: 48.758345, -119.408420  |  River Km: 858.099.000
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  8/26/2019
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Archived Event Logs