Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

YHC - Yellowhawk Creek

Status:   Active - Operations Unspecified
Site Type: Instream Remote Detection System  |  Organization: Confed. Tribes of the Umatilla Indian Reser.
General Operational Period: Year Round
Start Date: 12/1/2006 12:00 AM

Currently, monitoring Yellowhawk Creek for PIT tags consists of a single pass through antenna that spans the stream width. The antenna is located just downstream of the Second Division Works (Garrison Creek Diversion) at the Army Corps of Engineers Mill Creek Project. The site is powered by hardline and utilizes a 1001A transceiver connected to a laptop running MiniMon Ver1.7.0 with automatic upload capabilities. From 2007 - 2012, the site had a second antenna (B1) located downstream from the current antenna, near Walla Walla High School (46.043558, -118.320073).

Current Operations

Last File Loaded: YHC-2024-354-P-002.json
Date Last File Loaded: 12/19/2024 1:40 PM
Date Last File Opened: 12/19/2024 11:47 AM
Date Last File Closed: 12/19/2024 11:47 AM
Last Observation Tag: 3DD.003DEA6D09
Last Observation Date: 11/18/2024 6:49 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Robert Hogg
RobertHogg@ctuir.org
541-429-7547

Data Steward:

Travis Olsen
travisolsen@ctuir.org
541-429-7542
Location
Coordinates: 46.074979, -118.273783  |  River Km: 509.070.014
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/29/2012
End Date:  ----
Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary
Archived Event Logs