Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

WSR - Warm Springs River PIT Array

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Confed. Tribes of the Warm Springs Reser.
General Operational Period: Year Round
Start Date: 8/14/2014 12:00 AM

The Warm Springs River PIT tag array is a ninety foot array, consisting of four 20-foot and one 10-foot flat panel array installed end-to-end across the entire river channel. The array was installed during the week of August 4, 2014 by BIOMARK and CTWSRO personnel. The array is powered by a propane fueled thermo-electric generator.

Current Operations

Last File Loaded: WSR-2024-110-P-001.json
Date Last File Loaded: 4/19/2024 1:40 PM
Date Last File Opened: 4/19/2024 8:24 AM
Date Last File Closed: 4/19/2024 11:45 AM
Last Observation Tag: 3DD.003E18BD2D
Last Observation Date: 4/19/2024 9:57 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Brett Turley
brett.turley@merck.com
208-841-2562

Data Steward:

Lyman Jim
lyman.jim@ctwsbnr.org
541-553-3587

Location

Coordinates: 44.859752, -121.068348  |  River Km: 328.135.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/17/2023 12:00 AM 9/12/2023 12:00 AM Start and end dates based on timer tags.
2022 3/24/2022 12:00 AM 12/12/2022 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 3/7/2021 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 12/29/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 8/14/2014 12:00 AM 1/1/2015 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  8/10/2014
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
2/15/2024 9:19:00 AM SiteUp

TEG was repaired and re-installed. The site is up and running as of 2/15/24. However, the satellite modem or the MC comm board may have been damaged when power was low. Currently data uploading is on pause while comms equipment is being examined and repaired.

10/24/2019 1:51:01 PM SiteDown Site was down from 8/6 at about 11:15 until 8/15 at 14:12 because propane ran out.
6/20/2018 7:34:10 AM General Site ran out of propane and was down from about 10:24 on 6/18 until 12:43 on 6/19. Approximately 26 hours and 19 minutes.
4/2/2018 8:32:43 AM General I reset the Master Controller clock to the correct time.
6/27/2017 9:20:07 AM General The cell modem malfunctioned on or around 6/21. I temporarily turned off site checking for the site until we get the modem replaced.
2/15/2017 1:32:39 PM SiteUp Power was restored to the site at approximately 11:55 PST on 2/15.
2/15/2017 1:32:39 PM General There is a data gap that is approximately 2 days and 6 hours long due to the power outage on 2/13.
2/14/2017 1:11:00 PM SiteDown WSR lost power on 2/13 after 03:35 am PST. Warm Springs personnel are in the process of getting power restored to the site. Hope to have it back up on 2/15.
1/18/2017 4:06:13 PM General Graham Boostrom was able to get the modem working. I was able to connect to the site remotely and download the buffer. Site checking is now turned back on.
1/13/2017 1:00:00 PM SiteUp Propane was delivered and the site was turned back on the afternoon of 1/13/17. There were several delays due to bad weather. The site went down on the night of 1/5/17. The cell modem is not working. WS Fisheries personnel are going to retrieve the modem as soon as they can. It may need to be repaired or replaced.
1/5/2017 9:00:00 PM SiteDown Site ran out of propane on 1/5/17 after 8:29 pm. WS fisheries personnel are in the process of getting more propane to the site but bad weather is causing a delay.
9/21/2016 1:37:17 PM General MC and IS-1001 firmware was updated from ver. 1.6.0 to 1.6.1
10/4/2015 2:03:01 AM General The site ran out of propane on 10/4/15 at approximately 02:30 am and shut down. Power was restored on 10/6/15 at about 12:00 pm
2/18/2015 2:50:38 PM SiteDown WSR ran out of propane on 2/15/15 and the site went down. The last record for that day was at 09:34 am PST. The site power was restored on 2/18/15 at approximately 11:30 am PST. 
10/23/2014 10:09:02 AM General I turned on automatic file uploading for WSR. Data will be uploaded every 6 hours. I set an alarm threshold for 12 hours.
10/22/2014 2:40:51 PM General Registered new interrogation site WSR in PTAGIS.

No Archived Event Logs