Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

WRP - Woodland Release Ponds

Status:   Active - Non-Operational
Site Type: Monitored Fish Release  |  Organization: PacifiCorp Energy
General Operational Period: Seasonally
Start Date: 2/7/2018 12:00 AM

The Woodland Release Ponds have four raceways paired in two ponds. Each pond has a single PIT tag antenna located in one of the last two (moveable) dam board slots. This site will be in operation to monitor volitional releases from the pond.

Current Operations

Last File Loaded: WRP-2023-198-P-001.json
Date Last File Loaded: 7/17/2023 5:21 PM
Date Last File Opened: 7/17/2023 12:04 PM
Date Last File Closed: 7/17/2023 3:05 PM
Last Observation Tag: 3DD.003E478429
Last Observation Date: 7/13/2023 6:22 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Heath Curtis
heath.curtis@merck.com
208-936-1422

Data Steward:

Mark Ferraiolo
mark.ferraiolo@pacificorp.com
360-225-4446

Location

Coordinates: 45.925482, -122.719451  |  River Km: 140.014

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 7/18/2023 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/7/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/26/2019 12:00 AM Start and end dates based on timer tags.
2018 2/7/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/7/2018
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
3/26/2018 8:00:00 AM SiteDown System is currently turned off.

No Archived Event Logs