Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

WRP - Woodland Release Ponds

Status:   Active - Non-Operational
Site Type: Monitored Fish Release  |  Organization: PacifiCorp Energy
General Operational Period: Seasonally
Start Date: 2/7/2018 12:00 AM

The Woodland Release Ponds have four raceways paired in two ponds. Each pond has a single PIT tag antenna located in one of the last two (moveable) dam board slots. This site will be in operation to monitor volitional releases from the pond.

Current Operations

Last File Loaded: WRP-2024-330-P-004.json
Date Last File Loaded: 11/25/2024 5:23 PM
Date Last File Opened: 11/25/2024 1:50 PM
Date Last File Closed: 11/25/2024 4:50 PM
Last Observation Tag: 3D9.1A4FD2B82C
Last Observation Date: 11/25/2024 7:34 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Heath Curtis
heath.curtis@merck.com
208-275-0011

Data Steward:

Mark Ferraiolo
mark.ferraiolo@pacificorp.com
360-225-4446
Location
Coordinates: 45.925482, -122.719451  |  River Km: 140.014
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/7/2018
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary

No Archived Event Logs