Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

WR1 - Wallowa River at river km 14

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Nez Perce Tribe
General Operational Period: Year Round
Start Date: 1/1/2014 12:00 AM

WR1 is an in-stream detection system consisting of a single array located in the Wallowa River, Oregon. The array is located at river km 522.271.131.014 (N 45.633769 ° W -117.73369°) and consists of six 20 foot Biomark flat panel antennas. The array spans all but 20 feet of the river at base flow. WR1 is operated by the Integrated Status and Effectiveness Project (ISEMP) cooperators Nez Perce Tribe Fisheries and Quantitative Consultants, Inc. and was installed for continuous monitoring on August 16, 2013. The array includes ISEMP standard site monitoring equipment including: air and water temperature probes, and a water pressure transducer to monitor stream level. Electrical power is provided by a thermal electric generator. Remote communication is provided by a satellite phone modem. Data collection started on August 16, 2013.

Current Operations

Last File Loaded: WR1-2024-324-P-005.json
Date Last File Loaded: 11/19/2024 10:44 PM
Date Last File Opened: 11/19/2024 6:21 PM
Date Last File Closed: 11/19/2024 9:57 PM
Last Observation Tag: 3DD.003E49D003
Last Observation Date: 11/19/2024 9:57 PM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Cameron Albee
camerona@nezperce.org
541-432-2503

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446
Location
Coordinates: 45.633679, -117.733757  |  River Km: 522.271.131.014
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  8/16/2013
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

No Archived Event Logs