Interrogation Site Metadata
WPC - Wimpey Creek, Lemhi R. Basin
Status: DecommissionedGeneral Operational Period: Year Round
Start Date: 10/9/2013 6:00 PM
End Date: 4/25/2018 6:00 PM
In-stream detection system consisting of two antennas deployed serially about 30 meters apart in Wimpey Creek and is approximately 70 meters upstream of the confluence with the Lemhi River. WPC is operated by the Integrated Status and Effectiveness Project (ISEMP) cooperators Idaho Fish and Game and Quantitative Consultants, Inc. The initial configuration consisting of three arrays of three antennas each was replaced in August of 2017 to two 20 foot ABS antennas. Site electricity comes from the adjacent electrical service lines and remote communication is provided by a cellular telephone modem. Environmental conditions are monitored by air temperature. Site was removed in April 2018
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.