Interrogation Site Metadata
WEB - Webb Creek
Status: DecommissionedGeneral Operational Period: Year Round
Start Date: 11/17/2010 2:20 PM
End Date: 9/9/2022 12:00 AM
This is an in-stream interrogation system consisting of two separate antennas, 10 meters apart and approximately 1.0 kilometers upstream from the mouth of Webb Creek, powered by a Destron Fearing FS1001M (labeled D0). The upstream antenna, D1, and downstream antenna, D2, each consist of a single PVC flat-plate antenna engineered by NMFS. The antennas both cover the width of the stream in all but the highest spring discharges. WEB is operated by the University of Idaho, Department of Fish and Wildlife Resources in coordination with Bureau of Reclamation.
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.