Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

WCC - Wilson and Cherry creeks

Status:   Active - Non-Operational
Site Type: Instream Remote Detection System  |  Organization: Yakama Nation
General Operational Period: Year Round
Start Date: 2/7/2023 12:00 AM

Antennas are connected to IS1001 ACNs which are daisy chained together and connected to a IS1001 MTS located at the Cherry Creek gauging station. Antennas 01 and 02 are located in Wilson Creek and antennas 0A and 0B are located in Cherry Creek. All antennas are secured using MR-4 earth anchors and NRS straps. The top of each antenna is zip-tied to mule tape that is attached to T-posts positioned at the high water mark of each bank. The maximum vertical distance between the top and bottom of the antenna coils is approximately 7 ft. The site is grid powered and will run year-round.

Current Operations

Last File Loaded: WCC-2024-075-P-001.json
Date Last File Loaded: 4/23/2024 9:40 AM
Date Last File Opened: 3/15/2024 11:19 AM
Date Last File Closed: 4/23/2024 7:45 AM
Last Observation Tag: 3DD.003E2B1130
Last Observation Date: 4/22/2024 6:06 PM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Todd Newsome
tnews@yakama.com
509-945-5729

Data Steward:

Zack Mays
zack_mays@yakama.com
Location
Coordinates: 46.925883, -120.500967  |  River Km: 539.237.001
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/7/2023
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary

No Archived Event Logs