Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

WB1 - White Bird Cr Seasonal IPTDS

Status:   Active - Non-Operational
Site Type: Instream Remote Detection System  |  Organization: Nez Perce Tribe
General Operational Period: Seasonally
Start Date: 1/15/2021 12:00 AM

White Bird Creek is a tributary of the lower Salmon River, Idaho. The confluence of White Bird Creek is on the east side of the Salmon River at river kilometer 86 and about 5.8 miles in length, and is a minor spawning area for the Snake River summer steelhead within the Little Salmon River steelhead population. The White Bird Creek interrogation site was installed as a temporary and seasonal site at river kilometer 2 to estimate steelhead abundance within the White Bird Creek spawning aggregate because an interrogation site downstream of the Little Salmon River capable of providing a population estimate for the population does not exist.

Current Operations

Last File Loaded: WB1-2022-140-P-00A.xml
Date Last File Loaded: 6/7/2022 9:01 AM
Date Last File Opened: 5/20/2022 12:36 PM
Date Last File Closed: 5/20/2022 11:21 PM
Last Observation Tag: 3DD.003D82B476
Last Observation Date: 5/13/2022 10:18 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

John Robbins
johnr@nezperce.org
208-634-5290 x3307

Data Steward:

Peter Cleary
peterc@nezperce.org
208-621-3572
Location
Coordinates: 45.758183, -116.306603  |  River Km: 522.303.086.002
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/14/2021
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary

No Archived Event Logs