Interrogation Site Metadata
WB1 - White Bird Cr Seasonal IPTDS
Status: Active - Non-OperationalGeneral Operational Period: Seasonally
Start Date: 1/15/2021 12:00 AM
White Bird Creek is a tributary of the lower Salmon River, Idaho. The confluence of White Bird Creek is on the east side of the Salmon River at river kilometer 86 and about 5.8 miles in length, and is a minor spawning area for the Snake River summer steelhead within the Little Salmon River steelhead population. The White Bird Creek interrogation site was installed as a temporary and seasonal site at river kilometer 2 to estimate steelhead abundance within the White Bird Creek spawning aggregate because an interrogation site downstream of the Little Salmon River capable of providing a population estimate for the population does not exist.
Current Operations
Last File Loaded: | WB1-2022-140-P-00A.xml |
Date Last File Loaded: | 6/7/2022 9:01 AM |
Date Last File Opened: | 5/20/2022 12:36 PM |
Date Last File Closed: | 5/20/2022 11:21 PM |
Last Observation Tag: | 3DD.003D82B476 |
Last Observation Date: | 5/13/2022 10:18 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | Site did not operate in 2023. | ||
2022 | 1/21/2022 12:00 AM | 5/21/2022 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/15/2021 12:00 AM | 6/23/2021 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | 03 | 01 |
Upstream Array | 03 | 02 |
Downstream Array | 03 | 03 |
Downstream Array | 03 | 04 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
12/31/2023 11:00:00 PM | SiteDown |
WB1 was not operated in 2023 and is inactive. |
7/6/2022 12:00:00 AM | General |
The PIT Tag antennas and all other equipment were removed from the site. |
5/20/2022 12:00:00 AM | SiteDown |
All four nodes for antennas 01, 02, 03, and 04 failed within an hour of each other. The cause of the failure could not be determined when a maintenance check was performed on June 6. High water prevented access to the nodes. The system was powered down on June 7. |
3/25/2022 10:00:00 AM | GMC |
A general maintenance check was performed today. The external storage device was changed out so the data could be backed up and uploaded to PTAGIS. |
2/4/2022 11:00:00 AM | General |
The data was downloaded today. The system was operating correctly. |
2/3/2022 2:27:00 PM | General |
Antennas 2 and 4 were giving a high noise warning of 30%. I adjusted the alarm threshold to stop the warnings. |
1/20/2022 12:30:00 PM | General |
Installed the Master Controller box and began operating site for 2022. |
1/20/2022 12:00:00 PM | SiteUp |
Seasonal operation of WB1 for 2022 began after the system was powered up and tested. |
12/9/2021 2:07:00 PM | General |
Configured and tested the MC box. |
6/22/2021 10:00:00 AM | General |
Operation of WB1 ended for the spring of 2021 and the site was powered down for the remainder of 2021. |
5/18/2021 8:00:00 AM | General |
Interruptions in data collection occurred between approximately 8:20 and 9:20 am as data was being downloaded and backed up. |
1/17/2021 1:00:00 PM | General |
Interruptions in operation occurred intermittently due to power issues. |
1/16/2021 1:00:00 PM | General |
Interruptions in operations on January 16 occurred intermittently due to power issues. |
1/15/2021 1:00:00 PM | General |
Installation of WB1 was completed and operation of WB1 for 2021 began. |