Interrogation Site Metadata
UG4 - Grande Ronde-Acclimation Site
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date:
The instream remote detection system is located at the upper Grande Ronde juvenile acclimation facility. The system is comprised of two pass-over antennas that are 30ft x 3ft. The site uses a master controller and two IS1001's to power the site. Power to the site is provided by 3 solar panels and one wind turbine. Data are manually downloaded.
Current Operations
Last File Loaded: | UG4-2024-287-P-001.json |
Date Last File Loaded: | 10/29/2024 3:50 PM |
Date Last File Opened: | 10/13/2024 10:54 AM |
Date Last File Closed: | 10/29/2024 11:20 AM |
Last Observation Tag: | 3D6.1533C2ED37 |
Last Observation Date: | 10/29/2024 11:20 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.