Interrogation Site Metadata
TU2 - Toppenish Unit 2
Status: Active - Operations UnspecifiedGeneral Operational Period: Year Round
Start Date: 8/29/2023 12:00 AM
The array is located 120 meters below the Unit 2 diversion on Toppenish Creek. Currently, the site consists of 1 row of floating antennas. The row of floating antennas is made up of three 10' antennas that are connected to a cable line that stretches across the channel. The antennas/enclosures were constructed by Biomark. The antennas at TU2 are connected to an IS1001 MC located in a job box and the site is connected to grid power.
Current Operations
Last File Loaded: | TU2-2024-053-P-001.json |
Date Last File Loaded: | 2/22/2024 7:40 AM |
Date Last File Opened: | 2/22/2024 3:57 AM |
Date Last File Closed: | 2/22/2024 6:57 AM |
Last Observation Tag: | 3DD.003DF4B263 |
Last Observation Date: | 2/21/2024 8:10 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.