Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

TR1 - Lower Trout Cr - Deschutes

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Oregon Dept. of Fish and Wildlife
General Operational Period: Seasonally
Start Date: 4/1/2012 12:00 AM

Lower Trout Creek PIT tag array is located at RKM 0.7 upstream from the confluence with the Deschutes River on privately owned land. This site consists of six 20ft long lay flat antennas. The antennas are orientated with 2 antennas orientated end to end to make up three 40 foot wide antenna rows spaced 10 feet apart to ascertain directionality of fish. Antenna number orientation is based on facing upstream. The furthest upstream antenna on the left is antenna number 1 the furthest upstream antenna on the right is number 2. Middle row left antenna is number 3 Middle row right antenna is number 4. Bottom (furthest downstream) row left antenna is number 5 and bottom right antenna is number 6.

Current Operations

Last File Loaded: TR1-2023-340-P-001.json
Date Last File Loaded: 7/27/2023 8:50 AM
Date Last File Opened: 12/6/2023 9:28 PM
Date Last File Closed: 12/6/2023 9:34 PM
Last Observation Tag: 3D9.1C2E0462F0
Last Observation Date: 6/7/2023 5:40 AM
Detection Summary: Last Day's Observations

Contacts

Data Steward:

Tom Nelson
tom.nelson@odfw.oregon.gov
541-923-7470

Location

Coordinates: 44.821445, -121.081093  |  River Km: 328.140.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/13/2023 10:47 PM 6/7/2023 5:40 AM Start and end dates based on file open and closed dates.
2022 1/1/2022 12:00 AM 11/15/2022 12:46 PM Start and end dates based on file open and closed dates.
2021 1/1/2021 12:00 AM 3/16/2021 12:10 PM Start and end dates based on file open and closed dates.
2020 1/1/2020 3:05 PM 6/16/2020 1:06 PM Start and end dates based on file open and close dates.
2019 1/1/2019 12:00 PM 6/20/2019 3:00 PM Start and end dates based on file open and close dates.
2018 1/1/2018 12:00 AM 7/10/2018 12:00 AM Start and end dates based on file open and close dates. File gap March 21 - April 1.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on file open and close dates. File gaps: July 5 - August 8, November 27 - December 1.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on file open and close dates. File gap June 6 - December 2.
2015 1/1/2015 12:00 AM 10/16/2016 12:00 AM Start and end dates based on file open and close dates. File gaps: January 26 - February 1, April 28 - October 2.
2014 1/1/2014 12:00 AM 12/31/2014 12:00 AM Start and end dates based on file open and close dates. File gaps: February 13-17, February 24 - March 1, April 24 - May 1, May 8 - November 1
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM Start and end dates based on file open and close dates. File gaps: February 14 - March 1, May 16 - December 1.
2012 4/1/2012 12:00 AM 1/1/2013 12:00 AM Start and end dates based on file open and close dates. File gaps: April 26-30; May 3-7, June 14 - September 5, October 29 - November 6.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/30/2023
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
10/1/2022 9:24:00 AM SiteUp During periods of extreme high temperatures site is shut down.
7/9/2018 11:32:00 AM SiteDown Very High air temperatures and low water conditions
10/22/2017 11:16:00 AM SiteUp Site back up.
7/5/2017 11:16:00 AM SiteDown Low water and extreme air temperatures
9/29/2016 8:32:00 AM SiteUp Station brought back online.
7/28/2016 8:32:00 AM SiteDown High air temperatures and low flow. Station shut down to preserve electronics
8/25/2014 3:51:40 PM General Registered new interrogation site TR1.
6/12/2012 2:11:00 PM SiteDown Low stream flow and high equipment operational temperatures.
3/1/2012 10:57:00 AM SiteUp New site up and running.

No Archived Event Logs