Interrogation Site Metadata
TPJ - Tucannon at Panjab Creek
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 4/23/2019 12:00 AM
TPJ is a permanent instream PIT tag interrogation site at RKM 74.5 on the Tucannon River and Panjab Creek. The site consists of two rows of antennas spanning the wetted width of the Tucannon River and a single antenna in Panjab Creek. The upstream row consists of two 20-foot PVC antennas above the mouth of Panjab Creek, installed in a flat-plate configuration and the lower or downstream row consists of two 20-foot antenna below the mouth of Panjab Creek, there is a single 20-foot antenna in Panjab Creek approximately 20 feet upstream from the mouth. Each antenna is powered by an IS1001-MC. The antennas were built and installed by WDFW. A thermo-electric propane generator which runs off a 300-gallon propane tank provide the electrical power at the site.
Current Operations
Last File Loaded: | TPJ-2024-064-P-001.json |
Date Last File Loaded: | 3/29/2024 2:40 PM |
Date Last File Opened: | 3/4/2024 12:12 PM |
Date Last File Closed: | 3/29/2024 10:12 AM |
Last Observation Tag: | 3DD.003E2B6444 |
Last Observation Date: | 3/28/2024 8:56 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 3/3/2023 12:00 AM | 10/21/2023 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 11/16/2022 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 12/1/2021 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 12/4/2020 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 4/23/2019 12:00 AM | 12/30/2019 12:00 AM | Start and end dates based on timer tags. |
2018 |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | 01 | 01 |
Upstream Array | 01 | 02 |
Panjab Array | 01 | 03 |
Downstream Array | 01 | 04 |
Downstream Array | 01 | 05 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
3/4/2024 11:00:00 AM | SiteUp |
Started site for the season. |
3/3/2023 12:00:00 PM | SiteUp |
Site started up for the season. |
11/15/2022 12:02:00 PM | SiteDown | Turned site off for the winter. |
10/2/2020 10:00:00 AM | SiteUp | Site re-installed and running after the 2020 flood. |
5/7/2020 1:00:00 PM | SiteDown | Turned site off, road still not fixed, can't get propane to site |
3/4/2020 12:00:00 PM | General | Antenna #1 has been reconnected and is operational. |
1/15/2019 11:47:00 AM | General | Thermo electric generator issues fixed, site running normally. |
1/14/2019 11:47:00 AM | General | Site was running intermittently from September due to issues with the thermo electric generator. |
9/11/2018 11:47:00 AM | SiteUp | Site started. |