Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

TFH - Tucannon Fish Hatchery

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 2/4/2012 12:00 AM

The Tucannon Fish Hatchery site is located at the Tucannon Fish Hatchery Adult Trap and Water Intake System on the Tucannon River, at River Kilometer 59.4. The site consists of six flat plate antennas (two rows of three antennas each) upstream of the weir, two antennas in the fish ladder and four flat plate antennas (two rows of two antennas each) approximately 400m downstream of the weir. The antennas in the fish ladder and downstream of the weir were added in December 2016 during a site overhaul that also included replacing the FS1001M transceiver with the IS1001-MC and the original 6 antennas. The antennas upstream of the weir were washed out February 2020 and have not yet been reinstalled. The site is connected to AC power and also includes a Campbell Scientific CR1000 data logger and remote communication via a satellite modem.

Current Operations

Last File Loaded: TFH-2024-356-P-005.json
Date Last File Loaded: 12/21/2024 10:23 PM
Date Last File Opened: 12/21/2024 6:13 PM
Date Last File Closed: 12/21/2024 9:13 PM
Last Observation Tag: 3DD.0078C2E24A
Last Observation Date: 12/20/2024 7:54 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Lance Ross
Lance.Ross@dfw.wa.gov
509-382-4755

Data Steward:

Michael Herr
michael.herr@dfw.wa.gov
Location
Coordinates: 46.309627, -117.657161  |  River Km: 522.100.059
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/8/2020
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary
Archived Event Logs