Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

TAN - Taneum Creek Instream

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: U.S. Fish and Wildlife Service
General Operational Period: Year Round
Start Date: 2/18/2010 12:00 AM

TThe interrogation site is located on Taneum Creek. From 2010 through 2016, it was located near the mouth of the creek. In 2017, the site was relocated approximately 3 km upstream near the Taneum Canal Company diversion dam and fish screen. The site is currently operating two stream-width antennas in a pass over configuration, synchronized by a Biomark IS1001 Master Controller. Each antenna is approximately 8.5 meters (28 ft) in length and 1 m (3 ft) wide. Previous configurations used a Destron-Fearing FS1001M transceiver and had from 1 to 6 antennas.

Current Operations

Last File Loaded: TAN-2024-141-P-001.json
Date Last File Loaded: 6/25/2024 4:41 PM
Date Last File Opened: 5/20/2024 2:56 PM
Date Last File Closed: 6/25/2024 9:56 AM
Last Observation Tag: 3DD.003E2557CB
Last Observation Date: 6/25/2024 2:47 AM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Craig Haskell
craig_haskell@fws.gov
509-637-3619

Data Steward:

Brittany Beebe
brittany_beebe@fws.gov
509-986-0613
Location
Coordinates: 47.080914, -120.744452  |  River Km: 539.271.003
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  12/12/2017
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary
Archived Event Logs