Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

SYC - Snyder Creek PIT Tag Array

Status:   Active - Non-Operational
Site Type: Instream Remote Detection System  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 1/1/2019 12:00 AM

The Snyder Creek PIT tag interrogation array is located in Snyder Creek, a tributary to the Klickitat River (RKM 22.8) (Klickitat County, Washington). The PIT tag array is located approximately 1.3 kilometers upstream from the confluence with the Klickitat River. The site consists of two 6.1 meter channel spanning arrays (one upstream and one downstream). The antennas are fixed to the substrate in a pass-over configuration. Two IS 1001 Antenna Control Nodes (ACN’s) in master/secondary master configuration, operate two antennas and record PIT tagged fish detected by the array. The site is powered by 6 12 volt batteries and has no charging infrastructure. Directions to the PIT array site from the mouth of the Klickitat at the Columbia River are as follows: Turn north onto HWY 142 from HWY 14. Proceed north on HWY 142 14 miles to an unmarked gravel road on the left side of the HWY just passed the 14 mile marker. From this point, proceed 0.2 miles to a gate. From this gate, proceed another 0.7 miles to another gate. From this gate, proceed 0.2 miles to arrive at the PIT array site.

Current Operations

Last File Loaded: SYC-2024-198-P-001.json
Date Last File Loaded: 8/21/2024 12:20 PM
Date Last File Opened: 7/16/2024 7:59 AM
Date Last File Closed: 8/20/2024 9:33 AM
Last Observation Tag: 3DD.003D67EE9D
Last Observation Date: 8/12/2024 10:22 PM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Nicolas Romero
nromero@ykfp.org
509-369-3568

Data Steward:

Mike Babcock
mbabcock@ykfp.org
509-369-3271
Location
Coordinates: 45.825557, -121.159068  |  River Km: 290.023.001
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  11/3/2014
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos
Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

No Archived Event Logs