Interrogation Site Metadata
SW2 - Upper Selway River Array
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 9/11/2017 12:00 AM
Site consists of a pair of Biomark IS1001-Master Controllers, 18-IS1001 readers, sixten 20 ft antennas and two 10 ft antennas. The antennas are arranged in single 340 ft array. IS1001-MC A0 controls antennas 01-09 (from left-bank) and IS1001-MC BO controls antennas 01-09 (from middle of channel to right bank). Site has AC power with Biomark PLC battery switcher, satellite communication and Campbell Scientific CS451 and 109 environmental probes.
Current Operations
Last File Loaded: | SW2-2024-110-P-004.json |
Date Last File Loaded: | 4/19/2024 10:30 PM |
Date Last File Opened: | 4/19/2024 6:58 PM |
Date Last File Closed: | 4/19/2024 8:58 PM |
Last Observation Tag: | 3DD.003E2B75DF |
Last Observation Date: | 4/17/2024 7:10 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/15/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 11/28/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 9/11/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
River Left-side Array | A0 | A1 |
River Left-side Array | A0 | A2 |
River Left-side Array | A0 | A3 |
River Left-side Array | A0 | A4 |
River Left-side Array | A0 | A5 |
River Left-side Array | A0 | A6 |
River Left-side Array | A0 | A7 |
River Left-side Array | A0 | A8 |
River Left-side Array | A0 | A9 |
River Right-side Array | B0 | B1 |
River Right-side Array | B0 | B2 |
River Right-side Array | B0 | B3 |
River Right-side Array | B0 | B4 |
River Right-side Array | B0 | B5 |
River Right-side Array | B0 | B6 |
River Right-side Array | B0 | B7 |
River Right-side Array | B0 | B8 |
River Right-side Array | B0 | B9 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
1/19/2024 11:00:00 AM | SiteUp |
Idaho Power repaired downed line. Power was restored to SW2. Site is operating continuously without disruption through January 22, 2024. |
1/12/2024 3:30:00 PM | SiteDown |
Site lost power due to downed power line near the site. |
8/2/2023 12:00:00 AM | General |
Replaced nodes for antennas A3, A6, and A9. Antennas A3 and A6 are operating but at a low amperage. Clearly antennas A3 and A6 will need to be replaced. Satellite modem connections have not been reliable during July and August 2023. |
9/14/2022 12:00:00 AM | SiteUp |
Antenna B0 03 lost current August 29, 2022 and was replaced September 14, 2022. |
9/14/2022 12:00:00 AM | GMC |
Antenna A0 06 node lost current spring of 2022. Antenna A0 06 node was replaced September 14 however antenna current did not return to normal operating Amperage. Antenna A0 06 will need to be replaced. |
8/16/2022 8:20:00 AM | SiteUp |
Remote communications resumed with a re-installed standalone satellite modem after the modem was stolen early March, 2022. SW2 A0 antenna A9 node was replaced with a 20 ft. mid-node due to low current from the existing terminal node. SW2 site operated intermittently March 23, 2022 through June 22, 2022 due to a dead battery bank. Data collection during this time was 12 hours per day. Dead batteries were replaced on June 23, 2022 and since then SW2 has operated continuously without disruption through August 22, 2022. |
9/22/2021 12:00:00 AM | GMC |
SW2 battery bank A 35A fuse failed and melted resulting in a loss of data12 hrs per day for 2 days. Fuse was replaced Septermber 24, 2021. SW2 has since operated continuously without disruption through November 2, 2021. |
6/8/2021 9:07:35 AM | General | Master Controller B0's ID changed to 01 resulting in several rejected interrogation files. I changed the ID back to B0 and repaired and re-submitted the rejected files. |
8/18/2020 2:34:00 PM | General | Upper Selway PIT array (SW2) antenna node 02 and 04 on the Master Controller B0 string was replaced. Updated firmware to v1.7.1. SW2 is operating continuously although, power outages in the area created 16 hours of downtime on September 9, 2020. |
6/9/2020 6:28:00 AM | General | Satellite SIM Card Swap and site maintenance. Batteries weak, LVD installed. Site Functional. |
1/16/2020 8:58:00 AM | General | SW2 antenna IS1000 readers (nodes) were replaced on antennas B2- B9. Antennas A1-A4 are not functioning. Additional nodes are needed to resurrect the full component of A0 antennas. |
10/9/2018 11:02:00 AM | General | Previous PIT on October 9, 2018 event stated that SW2 B0 reader can-bus cable was replaced. When in fact can-bus cable for SW2 A0 reader was replaced and not SW2 B0. |
10/9/2018 7:10:00 AM | General | Selway River Array (SW2) 600 ft. CAN-Bus cable was replaced for the B0 array on October 9, 2018. The cable actually failed on May 18, 2018 effectively knocking out all antennas on B0. SW2 in now running continuously without disruption through October 21, 2018. |
9/17/2017 11:00:00 AM | General | Breaker on B0 tripped on 9/17/17 around 11:10 AM. Reset on 9/26/17 at 3:32 PM. |
9/11/2017 4:20:00 PM | General | First day of continuous operation was on Sept. 11, 2017. |