Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

SUN - Sunnyside Instream Array

Status:   Active - Operations Unspecified
Site Type: Instream Remote Detection System  |  Organization: Yakama Nation
General Operational Period: Year Round
Start Date: 11/4/2015 12:00 AM

The Sunnyside instream PIT tag array is located 600M below Sunnyside dam on the Yakima river. The instream portion of the array consists of 16, 20ft PVC and HDPE flat plate antennas anchored to the substrate using M4 earth anchors. Antennas and enclosures were constructed by WDFW and Yakama Nation Fisheries. The upstream row has 8 antennas spanning the wetted width of the river during most flow conditions. The downstream row was initially installed with 3 antennas (09, 0A and 0B); the remaining 5 antennas were installed October 2016. In July of 2018, all 8 antennas on the upper row were replaced with 4 inch, 20 ft HDPE flat plate antennas. The antennas are powered using ACN readers located just below the antennas in submersible enclosures. The Qube lite is located in a job box adjacent to a BOR building used for monitoring river conditions. On 10/22/2018, the Qube was upgraded to a Qube 2.0. Grid power is used to run the site.

Current Operations

Last File Loaded: SUN-2024-310-P-001.json
Date Last File Loaded: 11/6/2024 3:13 AM
Date Last File Opened: 11/5/2024 8:44 PM
Date Last File Closed: 11/5/2024 8:44 PM
Last Observation Tag: 3DD.003D56B0DF
Last Observation Date: 11/5/2024 8:44 PM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Chris Frederiksen
chrisf@yakama.com
509-945-5018

Data Steward:

Zack Mays
zack_mays@yakama.com
Location
Coordinates: 46.496865, -120.442428  |  River Km: 539.166
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  10/13/2016
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary

No Archived Event Logs