Interrogation Site Metadata
STR - SF Salmon Satellite Facility
Status: DecommissionedGeneral Operational Period: Seasonally
Start Date: 6/24/2010 12:00 AM
End Date: 7/24/2019 12:00 AM
This array is located in the ladder of the South Fork Salmon River adult fish trap. The array consists of four antennas, a top-water (30 x 60) and submerged (12 x 15) antenna on both a down-ladder dam-board and an up-ladder dam-board. All fish migrating up the South Fork that try to migrate upstream of the satellite facility are forced into the ladder via a removable weir. This weir is a permanent structure with removable panels that is very effective at blocking the upriver movement of fish. Fish have the freedom to move into and out of the ladder at will and are not trapped until they jump a finger weir that is above all array antennas. Adult Chinook salmon that swim past the array and enter the ladder are sorted by origin. Natural origin fish are returned to the South Fork above the weir while hatchery origin fish are typically ponded and latter spawned, recycled through the fishery, or released elsewhere in the basin. Site is no longer active.
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2019 | 6/26/2019 12:00 AM | 7/24/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 6/28/2018 12:00 AM | 6/29/2018 12:00 AM | Start and end dates based on timer tags. |
2017 | 7/7/2017 12:00 AM | 10/12/2017 12:00 AM | Start and end dates based on timer tags. |
2016 | 6/17/2016 12:00 AM | 9/27/2016 12:00 AM | Start and end dates based on timer tags. |
2015 | 6/3/2015 12:00 AM | 7/16/2015 12:00 AM | Start and end dates based on timer tags. |
2014 | 7/2/2014 12:00 AM | 8/12/2014 4:00 PM | |
2013 | 6/7/2013 10:00 AM | 9/17/2013 12:30 PM | |
2012 | 6/14/2012 12:00 PM | 9/12/2012 12:00 PM | Site operational from June 14 - September 12. |
2011 | 7/12/2011 9:15 AM | 9/13/2011 10:00 AM | Trap installed on July 12 and dewatered on September 13. |
2010 | 6/24/2010 12:00 AM | 9/13/2010 12:00 PM | First year of operation. |
2009 | No data received in 2009 |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
DAMBOARD 1 - ORIFICE | A0 | A1 |
DAMBOARD 1 - OVERFLOW | A0 | A2 |
DAMBOARD 4 - ORIFICE | A0 | A3 |
DAMBOARD 4 - OVERFLOW | A0 | A4 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
7/7/2017 9:23:48 AM | SiteUp | As of 7/7/2017 at 09:00:01, STR is operational and is interrogating tags |
9/19/2016 12:18:00 PM | SiteDown | On 9/19/2016 the STR interrogation site was shut down for the season |
8/12/2014 4:00:00 PM | SiteDown | As of 8/12/2014 at 4:00 PM the STR has been shut down. |
7/2/2014 10:45:00 AM | SiteUp | The STR PIT interrogation site has been installed and as of 1045am on 7/2/2014 is interrogating tags |