Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

SSC - Silver Side Channel (Methow)

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 11/14/2014 12:00 AM
End Date: 12/6/2019 11:00 AM

SSC is a permanent instream PIT tag interrogation site located in the silver side channel, which flows into the Methow River at rkm 56.16. From 2014 until October 2016, the site was located at rkm 0.32 of the channel and consisted of two rows of three 20’ antennas. The channel underwent an extensive habitat project and the site was reinstalled downstream at rkm 0.19 of the channel. The site now consists of two rows of antennas, with each row spanning the wetted width of the channel during high flow. Each row consists of four 20’ HDPE antennas, installed in flat-plate configuration over non-channel areas, and in pass-through orientation in the channel itself. Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a QST QuBE. The antennas and ACN enclosures were built by West Fork Environmental. The site is powered by a series of four solar panels being regulated by a charge controller. SSC has remote communication abilities provided by a cellular modem. Site is no longer active.

Contacts

Primary Contact:

David Grundy
david.grundy@dfw.wa.gov
509-997-0048

Data Steward:

Jeremy Cram
Jeremy.Cram@dfw.wa.gov
509-664-3148 x16

Location

Coordinates: 48.309838, -120.062335  |  River Km: 843.051

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2019 1/1/2019 12:00 AM 12/6/2019 11:00 AM Start and end dates based on file open and close dates.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on file open and close dates.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on file open and close dates.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Site down from June 23 - September 16, when it came back online with only antennas 02 and 05 operating. Site down from October 5-11, while site was moved 130 m downstream and reconfigured with 2 additional antennas.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM Check event log for operational details.
2014 11/14/2014 12:00 AM 12/16/2014 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  10/11/2016
End Date:  12/6/2019

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
1/13/2017 7:24:00 AM SiteDown Reader was not operating from 01/13/2017 @ 07:24 through 01/13/2017 @ 09:03 due to power supply issues
1/10/2017 7:42:00 AM SiteDown Reader was not operating from 01/10/2017 @ 07:42 through 01/10/2017 @ 09:42 due to power supply issues
1/7/2017 11:27:00 PM SiteDown Reader was not operating from 01/07/2017 @ 23:27 through 01/09/2017 @ 12:42 due to power supply issues
1/7/2017 4:49:00 AM SiteDown Reader was not operating from 01/07/2017 @ 04:49 through 01/07/2017 @ 10:30 due to power supply issues
1/6/2017 7:13:00 AM SiteDown Reader was not operating from 01/06/2017 @ 07:13 through 01/06/2017 @ 10:59 due to power supply issues
1/5/2017 2:24:00 AM SiteDown Reader was not operating from 01/05/2017 @ 02:24 through 01/05/2017 @ 09:30 due to power supply issues
1/4/2017 6:27:00 AM SiteDown Reader was not operating from 01/04/2017 @ 06:27 through 01/04/2017 @ 09:29 due to power supply issues
1/2/2017 1:25:00 AM SiteDown Reader was not operating from 01/02/2017 @ 01:25 through 01/02/2017 @ 11:00 due to power supply issues
12/30/2016 12:32:00 AM SiteDown Reader was not operating from 12/30/2016 @ 00:32 through 12/30/2016 @ 09:46 due to power supply issues
12/27/2016 6:33:00 AM SiteDown Reader was not operating from 12/27/2016 @ 06:33 through 12/27/2016 @ 09:55 due to power supply issues
12/23/2016 4:18:00 AM SiteDown Reader was not operating from 12/23/2016 @ 04:18 through 12/24/2016 @ 09:36 due to power supply issues
12/18/2016 4:26:00 AM SiteDown Reader was not operating from 12/18/2016 @ 04:26 through 12/18/2016 @ 09:34 due to power supply issues
12/16/2016 7:43:00 AM SiteDown Reader was not operating from 12/16/2016 @ 07:43 through 12/16/2016 @ 09:26 due to power supply issues
12/12/2016 5:47:00 AM SiteDown Reader was not operating from 12/12/2016 @ 05:47 through 12/12/2016 @ 09:26 due to power supply issues
12/10/2016 4:50:00 AM SiteDown Reader was not operating from 12/10/2016 @ 04:50 through 12/10/2016 @ 09:53 due to power supply issues
12/6/2016 5:56:00 AM SiteDown Reader was not operating from 12/06/2016 @ 05:56 through 12/06/2016 @ 09:46 due to power supply issues
12/3/2016 9:21:00 PM SiteDown Reader was not operating from 12/03/2016 @ 21:21 through 12/04/2016 @ 09:30 due to power supply issues
11/24/2016 5:39:00 PM SiteDown Reader was not operating from 11/24/2016 @ 17:39 through 11/26/2016 @ 10:35 due to power supply issues
11/22/2016 4:04:00 PM SiteDown Reader was not operating from 11/22/2016 @ 16:04 through 11/23/2016 @ 10:13 due to power supply issues
11/19/2016 7:40:00 AM SiteDown Reader was not operating from 11/19/2016 @ 07:40 through 11/22/2016 @ 13:26 due to power supply issues
11/16/2016 5:44:00 AM SiteDown Reader was not operating from 11/16/2016 @ 05:44 through 11/16/2016 @ 09:17 due to power supply issues
11/8/2016 6:52:00 AM SiteDown Reader was not operating from 11/08/2016 @ 06:52 through 11/08/2016 @ 10:04 due to power supply issues
11/3/2016 4:28:00 PM SiteDown Reader was not operating from 11/03/2016 @ 16:28 through 11/04/2016 @ 10:29 due to power supply issues
10/29/2016 8:45:00 PM SiteDown Reader was not operating from 10/29/2016 @ 20:45 through 11/01/2016 @ 11:53 due to power supply issues
10/15/2016 3:22:00 PM SiteDown Reader was not operating from 10/15/2016 @ 15:22 through 10/16/2016 @ 08:54 due to power supply issues

No Archived Event Logs