Interrogation Site Metadata
SPR - Sanpoil River Instream Array
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 7/13/2016 12:00 AM
SPR is a permanent PIT tag interrogation system in the Sanpoil River, near Keller, WA. The Sanpoil River enters the Columbia River at RKM 981, which is 21 km upstream of Grand Coulee Dam. SPR is located 14 km upstream from the confluence with the Columbia River. The site consists of nine 20 foot HDPE antennas anchored to the stream bed for pass-over detection. Antennas are configured in 2 separate rows (5-upstream, 4-downstream). Each antenna is powered by a Biomark IS1001 reader multiplexed by an IS1001-MC. Power is delivered by a 1kw solar array that charges a 4 battery bank capable of 1000ah of reliable DC voltage. The site is not connected to any remote cellular or satellite communications and is only downloaded manually on site.
Current Operations
Last File Loaded: | SPR-2024-065-P-001.json |
Date Last File Loaded: | 4/1/2024 1:10 PM |
Date Last File Opened: | 3/5/2024 9:27 AM |
Date Last File Closed: | 4/1/2024 7:30 AM |
Last Observation Tag: | 3DD.0077D05D15 |
Last Observation Date: | 4/1/2024 12:04 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/5/2023 12:00 AM | 12/5/2023 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/4/2022 12:00 AM | 12/21/2022 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/3/2021 12:00 AM | 12/20/2021 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 12/29/2020 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | |||
2018 | 1/1/2018 12:00 AM | ||
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | System down April 23 - October 11 due to damage from high flow event. Site was reinstalled in October with 3 additional antennas. Antennas were ordered backwards to PTAGIS convention - from right to left when looking downstream instead of from left to right |
2016 | 7/13/2016 12:00 AM | 1/1/2017 12:00 AM | First year of operations |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | 01 | 01 |
Upstream Array | 01 | 02 |
Upstream Array | 01 | 03 |
Upstream Array | 01 | 04 |
Upstream Array | 01 | 05 |
Downstream Array | 01 | 06 |
Downstream Array | 01 | 07 |
Downstream Array | 01 | 08 |
Downstream Array | 01 | 09 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
This displays the last 25 events, to see the full history, log in to theĀ Event Logs.
Event Date | Event Type | Comments |
---|---|---|
1/2/2024 9:00:00 AM | SiteUp |
Batteries recharged and installed. Nodes connected. |
12/1/2023 12:00:00 PM | SiteDown |
Power lost to entire site due to snow storms covering solar panels. |
9/8/2023 8:00:00 AM | SiteUp |
Solar charger and batteries reinstalled. Node 9 repaired(All nodes connected) |
8/12/2023 12:00:00 AM | SiteDown |
Solar charger and batteries damaged. All nodes disconnected |
7/26/2023 9:00:00 AM | SiteUp |
Nodes 4,5,6,7,8 repaired and connected |
5/16/2023 10:00:00 AM | SiteDown |
Nodes 6,7,8, and 9 damaged and disconnected due to high flows. |
4/12/2023 8:00:00 AM | SiteDown |
Node 4 and 5 disconnected (Damaged due to high flows) |
1/5/2023 12:32:00 PM | SiteUp |
Batteries have been recharged and installed. |
12/14/2022 6:31:00 AM | SiteDown |
Array shutdown due to solar panels being covered by snow and not charged batteries. |
9/17/2022 12:00:00 PM | SiteUp |
Antennas 6-9 back online |
8/6/2022 7:00:00 AM | SiteDown |
Antennas 6-9 shutdown due to short |
7/27/2022 9:00:00 AM | SiteUp |
Antennas 6-9 reconnected |
7/14/2022 6:00:00 AM | SiteDown |
Short in Home run cable causing antenna 6-9 to shutdown |
3/31/2022 8:00:00 AM | General |
Antenna 04,05,09 turned on and added into sequence |
1/4/2022 7:51:00 AM | SiteUp |
Batteries installed, site fully functioning. Antenna 4 and 9 taken out of sequence during low water. |
12/20/2021 9:30:00 AM | SiteDown |
Low voltage alarms batteries taken in to charge to full capacity |
12/6/2021 9:00:00 AM | SiteUp |
Batteries have been charged and solar electrical issues have been solved. |
11/30/2021 9:46:00 AM | SiteDown |
Solar batteries charging issues, master controller put into standby |
8/3/2021 11:00:00 AM | SiteUp |
Replaced Master controller and solar equipment |
6/9/2021 9:30:00 AM | SiteDown | Equipment Stolen |
2/3/2021 8:00:00 AM | General | Manually connected nodes 4 and 9 |
1/21/2021 9:00:00 PM | SiteUp | Site set to Controller Operation Mode: Scan |
1/5/2021 9:00:00 PM | SiteDown | Site set to Controller Operation Mode: Standby |
8/3/2020 8:00:00 AM | General | Nodes 4 & 9 manually disconnected during low flow |
7/14/2020 8:20:00 AM | General | Node 5 manually disconnected during low flow |