Interrogation Site Metadata

SPR - Sanpoil River Instream Array

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Colville Confederated Tribes
General Operational Period: Year Round
Start Date: 7/13/2016 12:00 AM

SPR is a permanent PIT tag interrogation system in the Sanpoil River, near Keller, WA. The Sanpoil River enters the Columbia River at RKM 981, which is 21 km upstream of Grand Coulee Dam. SPR is located 14 km upstream from the confluence with the Columbia River. The site consists of nine 20 foot HDPE antennas anchored to the stream bed for pass-over detection. Antennas are configured in 2 separate rows (5-upstream, 4-downstream). Each antenna is powered by a Biomark IS1001 reader multiplexed by an IS1001-MC. Power is delivered by a 1kw solar array that charges a 4 battery bank capable of 1000ah of reliable DC voltage. The site is not connected to any remote cellular or satellite communications and is only downloaded manually on site.

Current Operations

Last File Loaded: SPR-2024-065-P-001.json
Date Last File Loaded: 4/1/2024 1:10 PM
Date Last File Opened: 3/5/2024 9:27 AM
Date Last File Closed: 4/1/2024 7:30 AM
Last Observation Tag: 3DD.0077D05D15
Last Observation Date: 4/1/2024 12:04 AM
Detection Summary: Last Day's Observations

Contacts

Data Steward:

Holly McLellan
holly.mclellan@colvilletribes.com
509-209-2415

Location

Coordinates: 48.064751, -118.669612  |  River Km: 981.014

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/5/2023 12:00 AM 12/5/2023 12:00 AM Start and end dates based on timer tags.
2022 1/4/2022 12:00 AM 12/21/2022 12:00 AM Start and end dates based on timer tags.
2021 1/3/2021 12:00 AM 12/20/2021 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 12/29/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019
2018 1/1/2018 12:00 AM
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM System down April 23 - October 11 due to damage from high flow event. Site was reinstalled in October with 3 additional antennas. Antennas were ordered backwards to PTAGIS convention - from right to left when looking downstream instead of from left to right
2016 7/13/2016 12:00 AM 1/1/2017 12:00 AM First year of operations

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  8/22/2019
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
1/2/2024 9:00:00 AM SiteUp

Batteries recharged and installed.  Nodes connected.

12/1/2023 12:00:00 PM SiteDown

Power lost to entire site due to snow storms covering solar panels.

9/8/2023 8:00:00 AM SiteUp

Solar charger and batteries reinstalled. Node 9 repaired(All nodes connected)

8/12/2023 12:00:00 AM SiteDown

Solar charger and batteries damaged. All nodes disconnected

7/26/2023 9:00:00 AM SiteUp

Nodes 4,5,6,7,8 repaired and connected

5/16/2023 10:00:00 AM SiteDown

Nodes 6,7,8, and 9 damaged and disconnected due to high flows.

4/12/2023 8:00:00 AM SiteDown

Node 4 and 5 disconnected (Damaged due to high flows)

1/5/2023 12:32:00 PM SiteUp

Batteries have been recharged and installed. 

12/14/2022 6:31:00 AM SiteDown

Array shutdown due to solar panels being covered by snow and not charged batteries.

9/17/2022 12:00:00 PM SiteUp

Antennas 6-9 back online

8/6/2022 7:00:00 AM SiteDown

Antennas 6-9 shutdown due to short

7/27/2022 9:00:00 AM SiteUp

Antennas 6-9 reconnected 

7/14/2022 6:00:00 AM SiteDown

Short in Home run cable causing antenna 6-9 to shutdown

3/31/2022 8:00:00 AM General

Antenna 04,05,09 turned on and added into sequence

1/4/2022 7:51:00 AM SiteUp

Batteries installed, site fully functioning. Antenna 4 and 9 taken out of sequence during low water.

12/20/2021 9:30:00 AM SiteDown

Low voltage alarms batteries taken in to charge to full capacity

12/6/2021 9:00:00 AM SiteUp

Batteries have been charged and solar electrical issues have been solved.

11/30/2021 9:46:00 AM SiteDown

Solar batteries charging issues, master controller put into standby

8/3/2021 11:00:00 AM SiteUp

Replaced Master controller and solar equipment

6/9/2021 9:30:00 AM SiteDown Equipment Stolen
2/3/2021 8:00:00 AM General Manually connected nodes 4 and 9
1/21/2021 9:00:00 PM SiteUp Site set to Controller Operation Mode: Scan
1/5/2021 9:00:00 PM SiteDown Site set to Controller Operation Mode: Standby
8/3/2020 8:00:00 AM General Nodes 4 & 9 manually disconnected during low flow
7/14/2020 8:20:00 AM General Node 5 manually disconnected during low flow

No Archived Event Logs