Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

SJ1 - SF John Day (Mid)

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Oregon Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 7/19/2012 12:00 AM

This is an in-stream interrogation system located on the South Fork John Day River south of Dayville on the PW Schneider Wildlife Management Area (ODFW). This site has historically had either 3 or 6 antennas spaced across the low-water channel. When 6 antennas have been in place, there has been an upstream row of 3 antennas, and a downstream row of 3 antennas. This site is powered by a photovoltaic array. SJ1 is operated by NOAA, and was originally installed in 2005.

Current Operations

Last File Loaded: SJ1-2024-066-P-001.json
Date Last File Loaded: 3/6/2024 5:40 AM
Date Last File Opened: 3/6/2024 2:54 AM
Date Last File Closed: 3/6/2024 2:54 AM
Last Observation Tag: 3DD.003E1CA772
Last Observation Date: 3/6/2024 2:54 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Derrek Faber
Derrek.M.FABER@odfw.oregon.gov
541-296-8026

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446

Location

Coordinates: 44.422105, -119.540665  |  River Km: 351.341.010

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/4/2023 12:00 AM 12/21/2023 12:00 AM Start and end dates based on timer tags.
2022 1/7/2022 12:00 AM 12/30/2022 12:00 AM Start and end dates based on timer tags.
2021 1/3/2021 12:00 AM 12/25/2021 12:00 AM Start and end dates based on timer tags.
2020 1/6/2020 12:00 AM 12/30/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 6/19/2019 12:00 AM 12/27/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 8/25/2018 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM Start and end dates based on timer tags.
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM Start and end dates based on timer tags.
2013 2/12/2013 12:00 AM 1/1/2014 12:00 AM Start and end dates based on timer tags.
2012 7/19/2012 12:00 AM 12/29/2012 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  7/17/2012
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
11/13/2017 8:00:01 AM General I re-submitted files SJ117316.E0A and SJ117317.E0A.
11/13/2017 7:47:47 AM General I reset the mux clock to the correct time.
4/22/2016 9:18:05 AM General Antenna 1 was down from 4/5/16 through 4/21/16.
3/10/2014 5:09:00 PM General Antennas 2 and 5 down from 3/10/14 - 3/25/14
2/12/2014 9:39:00 AM SiteUp Site down for 4 days
2/8/2014 3:49:00 PM SiteDown Site down for 4 days
12/27/2012 1:20:00 AM SiteUp Site down for 3 days
12/24/2012 12:20:00 PM SiteDown Site down for 3 days

No Archived Event Logs