Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

SHP - Swift Hydroelectric Project

Status:   Active - Operational
Site Type: Juvenile Fish Bypass Facility  |  Organization: PacifiCorp Energy
General Operational Period: Seasonally
Start Date: 10/22/2016 12:00 AM

Fish enter the facility via a floating surface collector where they are sorted by size. Juvenile fish are either shunted directly to a holding tank to await transport downstream of Merwin Dam or they are sent to a sampling table where they are examined, possibly tagged, and sorted to either upstream of the Swift reservoir or downstream of Merwin Dam. All fish diverted to either tank pass through a PIT tag detector. There are two identical holding and sampling areas on the collector in which fish can travel. These areas are referred to the Port Side and Starboard Side. The port antenna was identified as 01 and the starboard antenna was 02. In February 2018 a third antenna was installed just above the sorting rack with an antenna ID of 01, and the port and starboard antennas were changed to 03 and 02, respectively.

Current Operations

Last File Loaded: SHP-2024-330-P-006.json
Date Last File Loaded: 11/25/2024 1:40 PM
Date Last File Opened: 11/25/2024 9:54 AM
Date Last File Closed: 11/25/2024 11:54 AM
Last Observation Tag: 3D9.1A4FD2B81B
Last Observation Date: 11/22/2024 3:18 PM
Detection Summary: Last Day's Observations
Contacts

Primary Contact:

Benjamin Winkler
benjamin.winkler@merck.com

Data Steward:

Mark Ferraiolo
mark.ferraiolo@pacificorp.com
360-225-4446
Location
Coordinates: 46.061502, -122.194679  |  River Km: 140.070
Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/8/2018
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Photos Not Found
Event Log Summary

No Archived Event Logs