Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

SHK - Shitike Creek PIT Array

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Confed. Tribes of the Warm Springs Reser.
General Operational Period: Year Round
Start Date: 4/24/2014 12:00 AM

The Shitike Creek PIT tag array is a fifty foot array, consisting of three flat panel antenna (one 10 foot and two 20 foot) installed end to end across the entire stream channel. The array was installed during the week of February 24, 2014 by BIOMARK and CTWSRO personnel. The array is located across the tailout of a pool created by a bridge (known as the Scale Bridge) that is used by logging truck to deliver lumber to the Warm Springs Mill.

Current Operations

Last File Loaded: SHK-2024-103-P-001.json
Date Last File Loaded: 4/12/2024 5:20 PM
Date Last File Opened: 4/12/2024 1:01 PM
Date Last File Closed: 4/12/2024 1:10 PM
Last Observation Tag: 3DD.003E44038E
Last Observation Date: 4/9/2024 8:20 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Benjamin Winkler
benjamin.winkler@merck.com

Data Steward:

Lyman Jim
lyman.jim@ctwsbnr.org
541-553-3587

Location

Coordinates: 44.764941, -121.243566  |  River Km: 328.155.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 6/3/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 No data received for 2021
2020 1/1/2020 12:00 AM 1/7/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 4/9/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 4/11/2018 12:00 AM 12/16/2018 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 9/1/2017 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 4/24/2014 12:00 AM 1/1/2015 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/24/2014
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
12/17/2018 12:37:34 PM General Site checking will be turned off until modem can be replaced. Data will be manually uploaded periodically.
6/1/2017 11:16:00 AM General Changed the exciter voltage levels from 5 to 3 to see if that would help the system stay on longer at night.
2/7/2017 5:00:00 AM SiteUp Power was restored again on 2/7 at about 05:30 am. PST. There is a data gap of approximately 3 days and 18 hours from 2/3 to 2/7.
2/3/2017 9:16:00 AM SiteDown The site lost power again on 2/3 after 08:30 am.
1/30/2017 1:00:00 PM SiteUp Power returned to the site on 1/30 at 1300 hrs. It is unclear who turned the power on and if it is on temporarily or permanently. Andy Johnsen of the Warm Springs Tribe is trying to run down how they can get the power turned on permanently.
1/6/2017 6:55:57 AM SiteDown Site has lost electricity. I turned off site checking until power is restored.
1/5/2017 1:39:35 PM SiteDown I have been unable to communicate with the site since 1/3 at @ 12:40 PST. Not sure if the site has lost power or if there is a modem issue. Will update when I found out.
9/21/2016 9:39:26 AM General MC and IS-1001 firmware was updated from 1.6.0 to 1.6.1
8/13/2014 2:02:59 PM General Automated file uploads were initiated on 8/12/14. The first file SHK14114.01A contains tag detections from 4/24 to 8/12.
8/7/2014 9:51:36 AM General Registered new site SHK, a PIT tag array on Shitike Creek, in PTAGIS. 

No Archived Event Logs