Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

SC4 - South Fork Clearwater Site 4

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Nez Perce Tribe
General Operational Period: Year Round
Start Date: 8/23/2021 12:00 AM

Upper, dual array to help quantify passage near Milepost 28 on state highway 14. Array is located just upstream of Forest Road 492 bridge and below Leggett Creek in the mainstem South Fork Clearwater River, Idaho.

Current Operations

Last File Loaded: SC4-2024-109-P-004.json
Date Last File Loaded: 4/18/2024 7:20 PM
Date Last File Opened: 4/18/2024 1:36 PM
Date Last File Closed: 4/18/2024 6:08 PM
Last Observation Tag: 3D9.1C2D85EAB6
Last Observation Date: 4/18/2024 6:08 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Cameron Albee
camerona@nezperce.org
541-432-2503

Location

Coordinates: 45.823500, -115.634100  |  River Km: 522.224.120.081

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 8/23/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  8/23/2021
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
7/31/2023 12:00:00 AM GMC

Site received zip ties on antenna cables where needed.  SC4 is operating continuously without disruption through August 8, 2023.

8/3/2022 3:00:00 PM SiteUp

Site is operating continuously with disruption through August 3, 2022.

No Archived Event Logs