Interrogation Site Metadata
SC4 - South Fork Clearwater Site 4
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 8/23/2021 12:00 AM
Upper, dual array to help quantify passage near Milepost 28 on state highway 14. Array is located just upstream of Forest Road 492 bridge and below Leggett Creek in the mainstem South Fork Clearwater River, Idaho.
Current Operations
Last File Loaded: | SC4-2024-109-P-004.json |
Date Last File Loaded: | 4/18/2024 7:20 PM |
Date Last File Opened: | 4/18/2024 1:36 PM |
Date Last File Closed: | 4/18/2024 6:08 PM |
Last Observation Tag: | 3D9.1C2D85EAB6 |
Last Observation Date: | 4/18/2024 6:08 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 8/23/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | D0 | 01 |
Upstream Array | D0 | 02 |
Upstream Array | D0 | 03 |
Upstream Array | D0 | 04 |
Downstream Array | D0 | 05 |
Downstream Array | D0 | 06 |
Downstream Array | D0 | 07 |
Downstream Array | D0 | 08 |
Downstream Array | D0 | 09 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
7/31/2023 12:00:00 AM | GMC |
Site received zip ties on antenna cables where needed. SC4 is operating continuously without disruption through August 8, 2023. |
8/3/2022 3:00:00 PM | SiteUp |
Site is operating continuously with disruption through August 3, 2022. |