Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

SC1 - Lower SF Clearwater R at rkm 1

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 8/18/2011 12:00 AM

Instream detection system located in the lower South Fork Clearwater River. The site is located at river km 0.9 consists of a single array of seven 20-ft Biomark HDPE antennas. The array spans the entire channel during low flow conditions. SC1 is operated by the Nez Perce Tribe and Biomark and was originally installed for continuous monitoring on August 19, 2011, with a FS2001M and six antennas. The site was upgraded to an IS1001-MTS on September 19, 2019. The array includes air and water temperature probes, and a water pressure transducer to monitor stream level. Electrical power is provided by grid power and remote communication provided by a cellular modem.

Current Operations

Last File Loaded: SC1-2024-110-P-002.json
Date Last File Loaded: 4/19/2024 6:30 PM
Date Last File Opened: 4/19/2024 1:13 PM
Date Last File Closed: 4/19/2024 4:13 PM
Last Observation Tag: 3DD.003DF9D014
Last Observation Date: 4/19/2024 2:43 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Cameron Albee
camerona@nezperce.org
541-432-2503

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446

Location

Coordinates: 46.137022, -115.981313  |  River Km: 522.224.120.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/10/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 11/26/2018 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 8/18/2011 12:00 AM 1/1/2012 12:00 AM First year of operations.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  9/18/2019
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
8/1/2023 12:00:00 AM GMC

Site received zip ties for antenna cables where needed.  Scouring downstream of antenna B3 was mitigated by armoring with large cobble.  SC1 is operating continuously without disruption through August 8, 2023. 

9/13/2022 12:00:00 AM SiteUp

Antenna 03 node lost current on August 23, 2022 and was replaced September 13, 2022.

8/17/2022 12:00:00 AM SiteUp

Zip ties were added where needed for loose antenna cables.  SC1 antennas currently have a scour on the downstream edge of antennas B2, B3, and B4.  Re-armored antennas with large substrate for a temporary solution.  Site is operating continuously without disruption through August 22, 2022.

11/2/2021 12:00:00 AM General

SC1 is operating continuously without disruption through November 2, 2021.

12/9/2020 2:01:00 PM General SC1 antenna 05 IS1001 reader was switched out due to intermittent performance from the original reader installed.
8/21/2020 2:06:00 PM General South Fork Clearwater 1 (SC1) antenna B6 stopped functioning in the fall of 2019. Antenna B6 was replaced with a new HDPE antenna on August 21, 2020. SC1 is operating continuously without disruption through September 21, 2020.
10/23/2018 7:16:00 AM General South Fork Clearwater (SC1) antenna B2 was replaced with a Biomark 20 ft. PVC antenna on October 23, 2018.
10/23/2018 7:16:00 AM General South Fork Clearwater (SC1) antenna B2 was replaced with a Biomark 20 ft. PVC antenna on October 23, 2018.
10/10/2018 7:10:00 AM General South Fork Clearwater Array (SC1) had Campbell Scientific data logger replaced with a new data logger designed by Biomark on October 8, 2018. A new 4G Cloudgate cell modem was also installed to replace the existing 3G cellular modem. SC1 site air temperature probe was changed out for a compatible model. SC1 is operating continuously without disruption through October 21, 2018.
7/25/2018 7:31:00 AM General South Fork Clearwater 1 (SC1) antennas B1 and B6 experienced a significant drop in current in early October 2017. B1 and B6 were replaced with Biomark 20 ft. PVC antennas on 7/25/18. SC1 is operating continuously without disruption through 7/26/2018.
11/16/2016 9:08:00 AM General South Fork Clearwater 1 array (SC1) is functioning and operational without disruption through 11/16/16.
1/13/2016 11:53:44 AM General The site is functioning and operating without disruption through January 13, 2015.
9/23/2014 10:44:58 AM General South Fork Clearwater 1 (SC1) is functioning  and operational without disruption through 9/23/14.

Archived Event Logs