Interrogation Site Metadata
S3B - Eagle Valley Ranch S3B
Status: DecommissionedGeneral Operational Period: Year Round
Start Date: 10/1/2019 12:00 AM
End Date: 2/26/2021 12:00 AM
This array is set up in a large engineered restoration project on Eagle Valley Ranch. There are several anastomozed channels and more are planned in 2020. The array is at the inlet of a recently built channel that branches downstream of the array. Currently, there are two branches of the side channel that re-connect with the Lemhi downtsream of this array, where fish can enter and leave the side channel without crossing the arrays S3A or S3B. The array is floating on the water surface, about 10-30 cm above the stream bed. Site removed February 2021.
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.