Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

RVP - Riverside Acclimation Pond

Status:   Active - Operational
Site Type: Monitored Fish Release  |  Organization: Colville Confederated Tribes
General Operational Period: Seasonally
Start Date: 4/15/2015 12:00 AM

Riverside Acclimation Pond, located on the Okanogan River at 819 Omak Riverside Eastside Rd, Omak, WA. Originally installed in 2015 with two 71 inch OD x 24 inch ID pass-through antennas located within the vault at the end of the pond. Site configuration was updated in 2018 to include three antennas located on an HDPE tube that is fitted within the release pipe in the vault at the end of the pond.

Current Operations

Last File Loaded: RVP-2021-109-P-00B.xml
Date Last File Loaded: 4/27/2022 2:50 PM
Date Last File Opened: 4/19/2021 7:15 AM
Date Last File Closed: 4/21/2021 11:44 AM
Last Observation Tag: 3DD.003D62B163
Last Observation Date: 4/21/2021 11:44 AM
Detection Summary: Last Day's Observations

Contacts

Data Steward:

Andrea Pearl
andrea.pearl@colvilletribes.com
509-422-7437

Location

Coordinates: 48.495093, -119.489821  |  River Km: 858.064

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023
2022 No 2022 data received for this site.
2021 4/19/2021 9:22 AM 4/21/2021 11:44 AM Start and end dates based on file open and closed dates.
2020 4/15/2020 12:00 AM 4/16/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 4/11/2019 12:00 AM 4/18/2019 12:00 AM Start and end dates based on timer tags.
2018 4/16/2018 12:00 AM 4/19/2018 12:00 AM
2017 4/13/2017 12:00 AM 4/17/2017 12:00 AM Spring Chinook yearling release.
2016 4/15/2016 12:00 AM 4/21/2016 12:00 AM Spring Chinook yearling release.
2015 4/15/2015 12:00 AM 4/21/2015 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  4/16/2018
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
4/15/2024 9:00:00 AM SiteUp

Started release of integrated 10J spring Chinook yearlings

4/4/2024 11:00:00 AM GMC

Biomark assisted our program with maintenance of our system. They removed IS001 reader S/N 1443.0933 and replaced it with S/N 1629.1607 temporarily.  We will use this reader for our interrogation in 2024 until 1443.0933 is repaired.

1/13/2023 11:43:00 AM General

Integrated yearling spring Chinook fish were released early due to the well going out in the pond, so due to this emergency release this interrogation site was not used for BY21.

4/22/2021 8:30:00 AM SiteDown End of integrated BY19 spring Chinook yearling releases
4/19/2021 8:30:00 AM SiteUp Start of integrated BY19 spring Chinook yearling releases
4/17/2020 9:00:00 AM SiteDown End of integrated yearling Chinook release. Tags downloaded and system shutdown.
4/15/2020 8:00:00 AM SiteUp Start of BY18 spring Chinook yearling release. Updated firmware on all (3) IS1001 readers to v 1.7.0. Ran full system antenna tune-up
4/18/2019 1:00:00 PM SiteDown End of 2019 hatchery integrated spring Chinook yearling releases
4/15/2019 12:00:00 PM SiteUp start of 2019 hatchery integrated yearling releases
4/19/2018 8:00:00 AM SiteDown End of integrated 10j spring Chinook yearling release
4/16/2018 2:00:00 PM SiteUp start of integrated spring Chinook fish release
4/17/2017 11:00:00 AM SiteDown End of CJH spring Chinook yearling release
4/13/2017 2:00:00 PM SiteUp Start of CJH spring Chinook yearling release
4/21/2016 12:00:00 PM SiteDown End of 2016 CJH spring yearling release
4/15/2016 3:00:00 PM SiteUp 2016 CJHP Spring Chinook Yearling Release
4/29/2015 3:04:00 PM General Registered new interrogation site for the Riverside Acclimation Pond - RVP.
4/21/2015 1:00:00 PM SiteDown End of release of BY13 10j spring Chinook yearlings. Antennas stored away for the season.
4/21/2015 1:00:00 PM SiteDown End of release of BY13 10j spring Chinook yearlings. Antennas stored away for the season.
4/15/2015 10:00:00 AM SiteUp Began release of BY13 10j spring Chinook yearlings

No Archived Event Logs