Interrogation Site Metadata
RFL - Redfish Lake Creek
Status: Active - Non-OperationalGeneral Operational Period: Year Round
Start Date: 4/13/2018 12:00 AM
The site is located on Redfish Lake Creek approximately one half mile upstream from the confluence with the Salmon River. The electronics enclosure and battery box are located on the river right bank on the back side of a storage shed used by the camp host at Chinook Bay Campground.The site consists of four 20ft HDPE antennas, located in a single string across the river. The antennas are constructed of fusion welded 4 inch HDPE pipe. Each antenna is driven by a Biomark IS1001 reader located in a submersible canister attached to the antenna. The readers are controlled by a Biomark IS1001-MC located in an enclosure on the shore. The antennas are anchored to the streambed with a through-strut method using DB-88 earth anchors attached to stainless steel threaded rod. The anchors are driven to a depth of 20-30 inches into the river bed. The IS1001 readers are connected to the IS1001-MC via Biomark CAN Bus cable. All cables are covered by flexible non-metallic conduit. Power for the system is supplied by six 12V 115Ah batteries, these batteries are run in series-parallel to create 24V to power the IS1001-MC and provide approximately 7 days of runtime.The required permits are still pending to install the complete enclosure and connect the system to AC power via an Isolation Transformer and disconnect switch. Until that time the system will be run off the above described battery system.
Current Operations
Last File Loaded: | RFL-2024-301-P-002.json |
Date Last File Loaded: | 10/27/2024 11:00 PM |
Date Last File Opened: | 10/27/2024 5:43 PM |
Date Last File Closed: | 10/27/2024 8:43 PM |
Last Observation Tag: | 3DD.003D9735A0 |
Last Observation Date: | 10/27/2024 8:37 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.