Interrogation Site Metadata

RCT - Roaring Creek Temporary Array

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Seasonally
Start Date: 3/3/2011 12:00 AM

This is generally a seasonal PIT tag detection system, based on flows, that is located at rkm 0.3 on Roaring Creek (Entiat River basin). The detection system consists of 2 10-foot antennas, installed in a pass-through configuration. The antennas span the wetted width of the channel during base flows. The site was initially equipped with a single antenna operated by an Allflex RM 310 reader board and data stored on an Acumen Databridge. In April 2017, the second antenna was installed and both antennas are operated by 2 synchronized IS1001 readers. Data from the antennas in the new configuration is stored on a USB flash drive that is uploaded to PTAGIS on a monthly basis. A 24V DC battery bank connected to solar panel powers the detection system. The antennas were built and installed by USFWS and NOAA staff. The site is typically installed and operated from February to July annually.

Current Operations

Last File Loaded: RCT-2024-086-P-061.json
Date Last File Loaded: 4/19/2024 11:20 PM
Date Last File Opened: 3/26/2024 5:21 AM
Date Last File Closed: 3/26/2024 5:21 AM
Last Observation Tag: 3DD.003DA29350
Last Observation Date: 4/12/2024 4:53 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Matthew Stilwater
matthew.stilwater@dfw.wa.gov
509-664-3148

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446

Location

Coordinates: 47.689304, -120.321980  |  River Km: 778.010.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 2/21/2023 12:00 AM 10/15/2023 12:00 AM Start and end dates based on timer tags.
2022 2/11/2022 12:00 AM 11/6/2022 12:00 AM Start and end dates based on timer tags.
2021 1/12/2021 12:00 AM 12/8/2021 12:00 AM Start and end dates based on timer tags.
2020 1/8/2020 12:00 AM 12/9/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 3/25/2019 12:00 AM 12/16/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 8/24/2018 12:00 AM Start and end dates based on file open and close dates.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on file open and close dates.
2016 2/1/2016 12:00 AM 1/1/2017 12:00 AM
2015 2/26/2015 12:00 AM 8/6/2015 12:00 AM
2014 3/19/2014 12:00 AM 6/4/2014 12:00 AM No interruptions in operations.
2013 3/26/2013 12:00 AM 6/26/2013 12:00 AM No interruptions in operations.
2012 3/5/2012 12:00 AM 6/11/2012 12:00 AM No interruptions in operations
2011 3/3/2011 12:00 AM 5/24/2011 12:00 AM No interruptions in operations

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  4/12/2017
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
2/8/2024 9:46:00 AM SiteUp

Replaced ACN of antenna 1 as it would not stay on. Site was turned on after being off for winter. 

10/16/2023 2:33:00 PM General

Readers were turned off to conserve batteries as solar conditions have deteriorated. 

8/12/2019 2:00:00 PM General Site overhauled with additional solar panel, new batteries, low voltage cutoff, and new antennas. Site will run continuously as solar power is available.
3/25/2019 11:35:13 AM General Site was turned on for season 3/25/19
7/3/2018 10:00:00 AM General At interrogation site RCT on 7/3/2018 at approximately 10:00 AM, site was brought back online. A bad battery was replaced, and connections on batteries were cleaned and tightened down. Both antennas are functioning. Site is fully operational.
2/7/2018 1:00:00 PM General Down stream antenna was pulled on 2-06-18 and repaired. Antenna was reinstalled 2-7-18 approx. 13:00.
2/1/2018 9:00:00 AM General Site visited. Data downloaded and batteries swapped.
1/17/2018 12:25:00 PM General Site visited. Swapped batteries.
1/4/2018 9:45:00 AM General Site visited. Data downloaded.
12/28/2017 10:30:00 AM General Site visited. Data downloaded. Site is fully operational.
12/21/2017 9:30:00 AM General Site visited. Data downloaded. Site is fully operational.
12/8/2017 9:30:00 AM General Site visited. Swapped batteries.
12/1/2017 11:00:00 AM General Site visited. Data downloaded. Site is fully operational.
11/29/2017 11:30:00 AM General Site visited. Swapped batteries
11/15/2017 10:40:00 AM General Site visited. Swapped batteries
11/13/2017 9:00:00 AM General Site visited. Data downloaded. Site is fully operational.
10/29/2017 9:00:00 AM General Site visited. Data downloaded and swapped batteries. Site is fully operational.
10/16/2017 11:00:00 AM General Site visited. Data downloaded and voltage checked. Site is fully operational.
10/3/2017 10:45:00 AM General Site visited. Data downloaded and voltage checked. Site is fully operational.
9/19/2017 11:00:00 AM General Site visited. Data downloaded and voltage checked. Site is fully operational.
9/6/2017 8:00:00 AM General Site visited. Data downloaded and voltage checked. Site is fully operational.
9/2/2017 9:05:00 AM General Site visited.
8/28/2017 11:22:00 AM General Site visited. Data downloaded and voltage checked. Antenna #2 was repaired because it was out of tune. Site is fully operational.
8/14/2017 9:30:00 AM General Site visited.
7/27/2017 11:00:00 AM General Site visited. Data downloaded and voltage checked. Antenna #2 was out of tune on arrival. Capacitors need to be replaced in order to read tags. Issue will be resolved in the near future.